Wolverton railway works
At its height Wolverton railway works was the largest carriage works in Britain, with some 4,000 workers, and the builder of Queen Victoria's saloon and later royal trains. It began in 1838 as a locomotive repair shop at the midpoint of the London and Birmingham Railway, built 166 locomotives for the London and North Western Railway, then turned wholly to carriages after 1862. In the Second World War it built Horsa gliders and armoured vans, and after 1962 it shrank steadily, leaving a small train maintenance depot at the western end of the site. It is also known as Wolverton Works or simply the Works, and it gave rise to the railway towns of Wolverton and New Bradwell.
Timeline
1838: Founding
The London and Birmingham Railway opens a repair shop for its locomotives at Wolverton, the midpoint of the 112 mile line. Engines are thought unsafe to run more than 50 miles without examination, and the site beside the Grand Union Canal suits it. Edward Bury, the line's locomotive superintendent, sees it as a repair shop only, but around it a railway town begins to rise.
1847: Other
James McConnell takes over from Bury as the superintendent of the Southern Division of the London and North Western Railway, which has absorbed the old line. Under him the works grows from a repair shop into a place that builds engines. He experiments with hollow axles, rubber springs and brakes, and designs the engines that will make Wolverton's name.
1851: Invention
The first of McConnell's "Bloomer" 2-2-2 express engines take to the rails. Seventy-four are built at Wolverton in three classes between 1851 and 1862, their exposed wheels and works said to recall the reforming dress of Mrs Amelia Bloomer. They stand beside the Wolverton Goods 0-6-0 and Wolverton Tank 0-4-2 as the works' own designs.
March 1862: Other
McConnell resigns after clashing with the company chairman, Richard Moon. Moon's cost-minded policy makes Crewe the railway's only locomotive builder, and Wolverton's directors are told to give its shops over to carriages. The cathedral-sized engine shed that built a reputation is about to lose its purpose.
September 1863: Other
The last of the 166 locomotives built at Wolverton leaves the works. Engine building at Wolverton ends here, and the shops are converted for carriage work.
1865: Transfer
Wolverton becomes the London and North Western Railway's carriage works, taking over the building of all its coaching stock, which had been built at Saltley in Birmingham. The change gives the works its lasting trade, and in time it becomes the largest carriage works in Britain.
1869: Construction
Wolverton builds a saloon for Queen Victoria, two six-wheeled carriages joined by the first bellows gangway in Europe. It begins the works' long link with royal travel, and the saloon survives today in the National Railway Museum at York.
1873: Invention
Wolverton-built sleeping carriages begin a sleeper service to Glasgow, followed in 1875 by services to Liverpool and Holyhead. The works goes on to make the sleeping cars for the Irish Mail in 1881 and the railway's first dining cars in 1889.
1901: Invention
Wolverton becomes the first railway works to use electricity throughout, for both lighting and driving machinery. It is a leap for a works that already runs on steam hammers and a hundred forges.
1903: Construction
A new royal train is built at Wolverton for King Edward VII. The works is now known as the home of the royal carriages.
c. 1914 to 1918: Conversion
In the First World War the works converts carriages into ambulance trains for service at home and abroad. Part of the site is also used by the Ministry of Munitions.
1923: Other
The London and North Western Railway merges into the London, Midland and Scottish Railway, and Wolverton begins building wagons alongside its carriages. The new owner keeps the works busy for decades.
c. 1939 to 1945: Other
In the Second World War the works stops railway work and joins other workshops in building Horsa gliders for the D-Day airborne assault. It repairs Whitley bombers and Hawker Typhoon wings, and turns about 700 vans into armoured vehicles. The works is camouflaged, and no Luftwaffe bombs fall on Wolverton, though traces of the wartime paint still show on the wall that divides the works from the town.
1962: Other
Wolverton is cut to a repair works, and the last new vehicle is completed in 1963. The workforce soon falls from 4,000 to 2,000, and the carriage works that once led Britain starts a long shrinking.
1977: Construction
The works fits out the present Royal Train, eight prototype Mark 3 coaches from 1972 refurbished with two Royal Saloons. In the same year it builds 24 vehicles for the Royal Mail and 21 diesel units for Northern Ireland Railways.
February 1986: Other
British Rail Engineering splits up, and Wolverton joins the BR Maintenance Group. Job losses follow, leaving about 850 staff, and the works is reduced to depot status the following year. Much of the site is later sold for a supermarket and car showrooms.
July 2013: Other
The operator Railcare enters administration, and many of its 225 workers lose their jobs. Knorr-Bremse buys the business in August. A train maintenance and refurbishment depot survives at the western end, while the rest of the site has become housing, shops and a community centre in the old bath house and fire station.