West Hub

The West Hub is a three-storey co-working, study and social building on JJ Thomson Avenue, at the centre of the University of Cambridge's West Cambridge site. Designed by Jestico + Whiles and built by Bouygues UK, it was the University's first building of its kind, bringing together students, staff, researchers, local businesses and the public. It holds a cafe, bar and shop on the ground floor with library, study and teaching spaces above, and is rated BREEAM Excellent. It opened in April 2022.

Timeline

2018: Other

The University's development arm, Lynxvale, picks Bouygues UK to build the new Cavendish III physics laboratory and a neighbouring shared facilities hub, in a package worth about 250 million pounds. The hub is the seed of the West Hub, meant to give the growing West Cambridge site a shared heart. Work on both buildings is expected to start in early 2019.

26 April 2022: Founding

The West Hub opens its doors to students, academics, researchers, local businesses and the wider public. It is the first building of its kind for the University, with the site's first bar, a cafeteria and shop below, and a library, study pods and meeting rooms above, all meant to get people from different departments talking to each other.

June 2022: Transfer

Bouygues UK formally hands the finished building over to the University. A low-energy design with a ground source heat pump, it has cut carbon emissions by 10 per cent and earned a BREEAM rating of Excellent. It stands beside the Ray Dolby Centre, the new Cavendish Laboratory, which Bouygues is still building on the same site.