Wearmouth Bridge (1796)

Rowland Burdon, County Durham MP, dared to throw a single iron arch of about 236 feet across the River Wear at Sunderland, the longest of its kind in the world when it opened on 9 August 1796. It replaced a ferry that had been the only crossing between Monkwearmouth and Bishopwearmouth, and it was high enough for tall-masted ships to sail beneath. Iron came from Walker and Co of Rotherham and Thomas Wilson raised the arch, while Thomas Paine's earlier experimental bridge was long said to be its model. It sagged within a decade, was rebuilt by Robert Stephenson's firm in 1857 to 1859, and in 1927 to 1929 was enclosed and replaced by the present steel arch on the same line. It is also known as the Sunderland Bridge or the Cast Iron Bridge.

Timeline

June 1792: Other

Rowland Burdon, MP for County Durham, pushes a bill through Parliament to bridge the Wear, where until now only ferries link Monkwearmouth to Bishopwearmouth and the nearest bridge is at Chester-le-Street. He first plans a stone arch. The idea of iron soon takes over, after Walker and Co of Rotherham put forward an iron design that borrows from Thomas Paine's experimental bridge.

24 September 1793: Construction

The foundation stone is laid with Masonic ceremony, Burdon being a prominent Freemason and William Henry Lambton present as Provincial Grand Master. The Latin inscription is pointedly anti-French, though the iron design owes something to the pro-Revolutionary Paine. A trial rib has already been assembled at Walker's in Rotherham, and Thomas Wilson of Sunderland will raise the arch on scaffolding that leaves the river open to shipping.

9 August 1796: Construction

The bridge opens on a Tuesday amid a vast crowd, estimated at 50,000. The Sunderland Volunteers fire a royal salute, and a Masonic procession marches from Mr Irvine's Inn through High Street to the south end. The arch spans 236 feet, rises 100 feet above the water and holds about 250 tons of iron, so ships pass beneath without lowering their masts. Burdon praises "Brother Wilson, the Architect of the Work", and the nation hails it as a triumph of British engineering.

1805: Other

The arch is failing. By 1804 a bulge of about 20 inches shows, and about a fifth of the tubes spacing the ribs have broken or dropped into the river. The Quaker John Grimshaw finds the arch 12 to 13 inches out of true, which he blames on a flood that scoured the river bed during construction. Only the timber frame has saved it from collapse. He braces the ribs with diagonals and the arch is straightened.

1817: Other

J. M. W. Turner sketches the bridge, by now one of the best-known sights of the north-east. Prints of it, and even Low Ford Pottery mugs, carry its image across the country.

1846: Other

Pedestrians stop paying to cross. For fifty years every foot passenger has paid a toll, and the toll house at the bridge end has taken it. Tolls on traffic stay.

1857 to 1859: Renovation

Robert Stephenson takes charge of rebuilding the ageing bridge, though ill health leaves George Henry Phipps to do the work. The deck is stripped back to its six cast-iron ribs, three tubular wrought-iron ribs are added, and the abutments are raised to flatten the steep central hump. It reopens in March 1859.

1879: Other

Tram lines are laid over the bridge, and a railway bowstring bridge opens beside it. The road crossing now carries Sunderland's growing traffic as well as its walkers.

1885: Other

The last toll goes and the crossing is free for the first time since 1796. The toll house, which later becomes a shaving saloon and shop, loses its purpose.

11 June 1919: Other

The engineer Basil Mott reports that the arch has risen about six inches at the crown since 1910, a movement he links to colliery workings beneath. He limits loads to 40 tons, with one such vehicle on the bridge at a time, and warns that fractures could appear in four or five years. Reconstruction is put off, but the drawings are begun.

1927: Destruction

Work begins on a replacement built around the old iron bridge, so the road never closes. William Arrol and Co of Glasgow, builders of the Forth Rail Bridge, raise new steel arches astride it, and cranes on a 460-ton temporary high-level structure carry out the demolition. The old bridge is dismantled piece by piece, at a cost of £12,000.

31 October 1929: Construction

The Duke of York, later George VI, opens the new bridge, which cost £231,943. Its crest of Sunderland arms by Benjamin Dean Wyatt, the railing crests from Stephenson's bridge and the motto "Nil desperandum, auspice Dei" at the centre keep faith with the iron predecessor. Today a plaque says the first bridge was a catalyst for Sunderland's growth.