For a few decades the Tunnel Works at West Thurrock was the biggest cement plant in Britain, with eight kilns and a capacity of about 900,000 tonnes a year in 1938. It began in 1874 with six bottle kilns on Tunnel Farm beside the Thames, from which it takes its name. It was rebuilt from 1911 by the Danish engineers F. L. Smidth as a showcase for their rotary kilns, and it was deliberately bombed in the Second World War. Rising costs, failing chalk and the energy crisis closed it in 1976, after about 41 million tonnes of clinker. It is also called Tunnel Works, and was run by the Tunnel Portland Cement Company, later Tunnel Cement Ltd. The quarry is now the Lakeside Retail Park, and the works site holds light industry and warehousing.

Timeline

1874: Founding

The Tunnel Portland Cement Company lights its first kilns on Tunnel Farm, a Thames-side site that has carried that name since at least the mid 1700s. Six wet-process bottle kilns make the clinker. It is a modest start for a site that will become the largest cement plant in the country.

1885: Construction

The works doubles to twelve bottle kilns, turning out about 330 tonnes a week. Six chamber kilns, adding another 150 tonnes a week, are built alongside them. The company is growing fast on the Thames chalk.

c. 1895: Renovation

Eight more chamber kilns are added and the old bottle kilns are abandoned. Output stands at about 400 tonnes a week and stays there into the 1900s. Having refused to join the 1900 cement combine, the company is still independent but small.

1911: Transfer

The Copenhagen engineers F. L. Smidth complete their purchase of the company and clear the old plant. They rebuild it around rotary kilns, intending it as a showcase for their equipment. A power house with turbo-generators is part of the new works.

29 March 1913: Construction

Kiln A1, the first of the new rotary kilns, goes into operation, about 62 metres long and coal-fired. A twin, A2, follows later in 1913. The renovated works is completed in 1914.

18 December 1923: Invention

Kiln A3 starts up and is announced as the first with an Unax planetary cooler, a ring of small cooling tubes on the kiln itself. The design becomes the standard form for the later kilns at the works. A4, started in 1929, carries a chain system that rivals copy.

1927: Other

London Clay from Aveley begins to reach the works as slurry, replacing alluvial clay that had come by barge from Canvey Island. It feeds the washmills until the works closes.

1929: Other

The works starts buying electricity from Barking and keeps its own power house as a backup. In the same year kiln A4, about 92 metres long, comes on line, with A5 following in 1931.

15 October 1934: Construction

Kiln A6, 150 metres long, starts up and makes Tunnel the largest cement plant in Britain, overtaking Johnsons. It is the country's biggest kiln, and stays so for years. White cement is made at the works from 1934 until Pitstone takes it over in 1957.

1936: Founding

Tunnel Asbestos Cement Co. Ltd sets up an asbestos-cement plant in the quarry north of the kilns. It takes the company beyond cement into building products.

18 June 1937: Construction

Kiln A7 is lit, the seventh kiln of the A series, and a deep-water wharf is built to the west the next year. By the 1938 aerial survey, which Tunnel commissioned to mark the start-up, the works has reached its final pre-war form, with a capacity of 900,000 tonnes a year.

1940s: Destruction

In the Second World War the works is badly damaged by bombing, and it seems to be the only cement plant in Britain singled out as a target, where elsewhere the damage was random. Kiln 6, then the largest in the country, is knocked out of action, then patched up and restarted.

1958: Renovation

The works switches its kilns from coal to oil, and new kilns are built without coal firing. Kiln A8 follows in 1959, built to oil firing.

1962: Construction

Kiln B1 starts up, 151.75 metres long. It is Britain's largest kiln, but Westbury's new kiln overtakes it the same year, so the record is lost almost at once.

1968: Other

The Tunnel Portland Cement Company becomes Tunnel Cement Ltd, and the 'Big T' brand appears in the late 1960s. A survey that year shows eight kilns, a nominal capacity of 1.5 million tonnes, and about 90 per cent of it achieved.

1971: Other

Northfleet overtakes Tunnel as the largest cement plant in Britain. Kilns A4 and A5 are shut early in the year, and the other kilns switch to gas.

April 1976: Destruction

The last kiln, A8, stops on 1 April 1976 and the works closes, having made about 41 million tonnes of clinker. It has the highest costs in the group, its chalk is running out, and the quarry cannot grow east because Grays blocks it. Energy prices after 1973 and a weak market finish it. The Aveley clay pits stop supplying the same year.

1982: Transfer

RTZ acquires Thomas W. Ward of Sheffield, and with it control of the Tunnel company, after Ward's bid for Tunnel the year before had failed. Tunnel Cement later becomes part of Castle Cement. The works site is by then light industry and warehousing, and its former quarry is the Lakeside Retail Park.