Tracked Hovercraft
At its height Tracked Hovercraft was a British government-backed plan for 250 to 300 mph trains floating on air cushions along an elevated concrete track, pushed along by linear induction motors, with a test line on the Fens at Earith. It grew out of Christopher Cockerell's hovercraft studies and Eric Laithwaite's linear motors, and was run by Tracked Hovercraft Ltd, a company spun off by the National Research Development Corporation in 1967. Only about a mile of the track was ever usable, and the research vehicle RTV 31 reached 104 mph on it in February 1973, days before the government cancelled the project in favour of British Rail's Advanced Passenger Train after about five million pounds had been spent. The project is also known as the hovertrain or the Earith hover rail. RTV 31 survives at Railworld in Peterborough, while at Earith a few concrete piers stand in the washland and the old track line is a dirt road.
Timeline
1960: Invention
At Hythe on Southampton Water, Christopher Cockerell's Hovercraft Development company begins studying a hovercraft that runs along a track instead of over water. The sticking point is propulsion: an aircraft-style propeller limits acceleration and efficiency. That problem will draw the idea towards the linear motor.
1963: Other
A hovertrain test rig runs at Hythe and is filmed by British Pathé, alongside a full-size model with an airliner-style two-deck body. It rides four lift pads on an upside-down T of concrete with aluminium plates for a motor. It is the first public picture of what a hovertrain might look like.
1967: Other
After lengthy negotiations the government launches the scheme with funding of about 5.25 million pounds. The persuasive Laithwaite is credited with winning extra money, and the French government's backing of Jean Bertin's Aerotrain adds urgency. The aim is to beat the French to a working hovertrain.
April 1967: Founding
Refused government money for the hovertrain, the National Research Development Corporation commits its own funds and spins the hovertrain group off as Tracked Hovercraft Ltd, with offices in Cambridge. Eric Laithwaite, frustrated at British Rail, joins as consultant. The company now has to win public money for a real track.
June 1969: Construction
Concrete goes in for an elevated track on the bank between the Old Bedford River and the Counter Drain, running from Earith towards Sutton Gault. The plan is 20 miles, but the soft Fenland ground makes the work hard and only about a mile is usable. The guideway stands some six feet above the ground.
1970: Performance
The track is finished and the first public demonstration shows a vehicle gliding along it at a modest 12 mph. The guideway has been redesigned as a square box girder after the double-sided motor design is judged too dangerous. Speeds will climb over the next two years.
1971: Arrival
The research vehicle RTV 31 reaches Earith and begins test running on the new track. Lifted on air pads and driven by a linear motor, it is the full-size proof the company has promised. The hope is a train from London to Glasgow in little more than two hours.
December 1971: Other
An interdepartmental working party reports on new inter-city transport for London to Manchester and London to Glasgow, weighing buses, the Advanced Passenger Train, tracked hovercraft and VTOL and STOL aircraft. It comes down strongly in favour of British Rail's tilting steel-wheel train. The finding leaves the Fenland project exposed.
1973: Other
Airey Neave and others accuse Heseltine of misleading the Commons, because the government had said it was still considering support after cabinet had already decided to end it. The Select Committee on Science and Technology examines the cancellation but is refused the cabinet papers. Laithwaite, publicly critical, turns to magnetic levitation.
7 February 1973: Other
On the single mile of track, RTV 31 reaches 104 mph into a 20 mph headwind. It is the best run the Earith team ever achieves, a long way short of the 300 mph the full line was meant to allow. The run is heavily publicised and fills the BBC news all day, partly because of rumours that the project is about to be cancelled.
c. 1973: Other
About a week after the record run the government cancels the funding, with some five million pounds spent. Aerospace minister Michael Heseltine says there is no prospect of installation before 1985, and British Rail's Advanced Passenger Train is backed instead. Heseltine had sent Michael McNair-Wilson to view the vehicle and had said he thought the project would survive.
1975: Destruction
The test track is taken down and the project is mothballed. Laithwaite's linear motor work lives on, and leads to the Birmingham airport maglev shuttle that runs from 1984 to 1995. The Fen is left with a few concrete piers and a line across the washland.
1996: Transfer
RTV 31, left outdoors at Cranfield University for more than twenty years, is donated to Railworld at Peterborough, restored and put on display. It can be glimpsed from East Coast Main Line trains approaching Peterborough. Back at Earith, concrete footings stand in a pond by the Counter Drain and the track line is a dirt road.