Tilbury power stations
Tilbury A and Tilbury B were two coal-fired power stations on the north bank of the Thames at Tilbury, Essex, on a site of about 91 hectares. Tilbury A (360 MW) opened in 1958 and Tilbury B (1,428 MW) was commissioned in 1968, both built for the state electricity industry and run by the Central Electricity Generating Board. After privatisation Tilbury B passed to National Power, Innogy and then npower (RWE), which tried to convert it to burn wood pellets. Tilbury A was largely demolished in 1999 and Tilbury B was taken down between 2016 and 2019, its site now earmarked for new energy and port uses.
Timeline
6 June 1958: Founding
Sir Francis Whitmore formally opens Tilbury A, a £18m coal-fired station of six 60 MW units beside the Thames. Planned in 1947, sanctioned in 1950 and begun in 1951, it has already been generating since 1956. It soon gains the ability to burn oil as well as coal.
1963: Other
The Central Electricity Generating Board uses Tilbury A as a testing ground for how sulphur dioxide disperses from chimney plumes. The experiments feed into the wider debate on air pollution from coal-fired stations.
1968: Construction
Tilbury B, begun in 1961, has its turbo-alternators commissioned, and it reaches full capacity of four 350 MW units in 1969. With two 168 m chimneys, it dwarfs its older neighbour and becomes one of the main suppliers to London and the south east.
16 November 1977: Disaster
A fire starts in the control room of Tilbury B and races through the cable ducts, cracking the £70m building badly. Three engineers are taken to hospital after breathing fumes. Crews bring in foam equipment from other stations and have the blaze contained by evening.
1981: Other
The Generating Board mothballs Tilbury A after about 25 years of service. Tilbury B carries on alone, and in 1990 privatisation hands it to National Power.
1999: Destruction
Tilbury A is largely demolished, leaving only a waste water structure and a small listed part. Its riverside ground is cleared in stages and by 2019 is fully levelled to make way for the Tilbury2 port.
27 February 2012: Disaster
A major fire breaks out in a fuel storage area holding thousands of tonnes of wood pellets for Tilbury B, which RWE npower is converting to biomass. More than 120 firefighters tackle it for hours, and relief crews stay on for days. It is the worst of several fires at the station.
July 2013: Other
RWE npower halts the conversion of Tilbury B to burn only wood pellets, which began in 2011 and was meant to make it the world's largest biomass generating site. Technical and financing difficulties and the lack of a government grant leave the station mothballed.
28 September 2017: Destruction
Explosives bring down the two 168 m chimneys of Tilbury B, long a landmark on the Thames. Decommissioning and demolition of the station runs from 2016 to 2019.
14 March 2019: Destruction
The fourteenth and last explosive demolition at the Tilbury B site is carried out, ending the physical story of the stations. The land is left for new energy projects.