Three Bridges, London

At its height Three Bridges in Southall carried a road over a canal that itself sits in an iron trough above a busy railway, three routes stacked in one structure although it holds only two bridges. Isambard Kingdom Brunel solved the crossing of the Grand Junction Canal and Windmill Lane for the Brentford branch of the Great Western Railway, and it opened with the line in July 1859, two months before his death. Passengers used the line from 1860 to 1942, and goods trains ran in numbers until Brentford Dock closed in 1964, leaving a single quiet track. It is also called Windmill Bridge, after the Southall windmill that stood beside the old canal bridge, and it is now a scheduled monument, a rare surviving Brunel cast iron bridge, with walkers and cyclists on the towpath above the rails.

Timeline

1790s: Construction

The Grand Junction Canal is cut through Southall in the 1790s, and a bridge carries Windmill Lane over it. A windmill, Southall Mill, stands on the south western side of the crossing and will give the spot its proper name. For six decades this is a plain lane crossing a waterway.

1806: Other

J. M. W. Turner paints the Southall windmill beside the canal. The mill is long gone, but its picture keeps the memory of the landmark that names Windmill Lane and Windmill Bridge.

14 August 1855: Founding

The Great Western and Brentford Railway is incorporated by Act of Parliament, against opposition from the canal owners. It is to run from Southall to a new dock at Brentford, and its path will have to pass the canal and Windmill Lane. The crossing at Southall becomes the hardest problem on the line.

3 March 1856: Construction

Work starts on the line and dock, with Brunel as chief engineer. At Southall he digs a cutting for the railway, hangs the canal in a cast iron trough above it and puts a new cast iron road bridge on top, rather than move the canal or the road. Contractors E. R. Murray and J. L. Tredwell build it, and the three level crossing takes three years. The iron founder is Matthew T. Shaw of Cannon Street in the City, whose name is cast into the side girders.

15 July 1859: Founding

The branch and its dock are formally opened, and goods trains begin to run through the cutting three days later, on 18 July. The crossing is among the last of Brunel's works to be finished, and he dies on 15 September, two months afterwards.

1 May 1860: Other

Passenger trains begin on the branch, running from a dedicated platform at Southall to a station at Brentford. Travellers now pass beneath the canal and the road, on a line laid to Brunel's broad gauge.

1861: Renovation

A standard gauge track is laid beside the broad gauge one. Freight now uses the new rails while passengers stay on the broad gauge.

1875: Renovation

The whole branch is converted to standard gauge as the Great Western gives up Brunel's broad gauge. The railway beneath the canal now matches the rest of the national network.

22 March 1915: Other

Passenger trains are suspended as a wartime economy, after electric trams have drawn travellers away since 1906. In 1919 the line is announced for permanent closure, but local pressure brings weekday trains back on 12 April 1920.

4 May 1942: Other

Passenger service on the branch is withdrawn for good, after road transport has eaten into numbers through the interwar years. From now on only goods trains pass beneath the canal.

1951: Other

Freight reaches its peak, with as many as 25 goods trains a day on the branch. Coke from the Southall gas works runs to the dock in block trains, and the Golden Mile factories at Brentford send out their goods by rail.

1956: Renovation

The branch is reduced to a single track as far as the Firestone tyre factory. Brunel's cutting, wide enough for two broad gauge tracks, is now half empty.

26 January 1970: Other

The crossing is made a scheduled monument, protected as a rare surviving Brunel cast iron bridge and an impressive combined bridge and aqueduct. Only about ten iron bridges by Brunel are thought to survive.

1977: Other

A waste transfer station opens in Brentford, after the Greater London Council agrees with British Rail to carry rubbish by the branch. Refuse trains become the line's new traffic, a few a week, after the dock closed in 1964.

24 August 1980: Other

The Great Western Railway Preservation Group runs special passenger trains for a day, the first on the branch in nearly forty years. They pass under the canal once more, then the line returns to its single track and little traffic.