Tay Bridge disaster

On the stormy evening of Sunday 28 December 1879 the central high girders of the first Tay Rail Bridge fall into the Firth of Tay with a North British Railway train from Burntisland crossing to Dundee. Nobody on board survives; 59 victims are identified, and the true toll may be higher, up to 75. The bridge, designed by Thomas Bouch and opened in 1878, had won him a knighthood only months earlier, yet a Court of Inquiry finds it badly designed, built and maintained, with no proper allowance for wind. Bouch is ruined, the Forth Bridge design is rethought, and wind loading becomes a standard concern of British engineering. William Henry Barlow's double-track replacement opens in 1887 beside the old piers. The stumps of the old piers still stand in the water beside the present bridge. It is also called the Tay Rail Bridge disaster.

Timeline

July 1871: Construction

Work starts at Wormit Bay on Thomas Bouch's bridge, meant to end the slow train ferries across the Tay for the North British Railway. The test bores seemed to show firm rock under the sand and gravel all the way to Dundee, but the bed proves deeper than expected. The design is changed to lighter open iron columns in place of solid brick piers, cast at a new foundry at Wormit.

February 1877: Other

Two of the high girders fall while they are being lifted into place over the water. It is an early warning that the central section is a hard piece of work, and the bridge goes on to be finished regardless.

26 September 1877: Other

A party of directors crosses the finished bridge behind the engine Lochee in a ceremonial opening. Dundee is proud of the longest bridge in the world, and that summer visitors including the former American president General Ulysses Grant come to see it.

February 1878: Other

A Board of Trade inspector examines the bridge over three days of good weather and passes it as safe and suitable. He recommends a 25 mph speed limit but never tests how it behaves under a train in high wind, the very thing that will later destroy it.

1 June 1878: Construction

The single-track bridge opens to passenger traffic, carrying the Edinburgh to Aberdeen line across the firth for the first time. Trains cross day and night for about eighteen months without an accident.

20 June 1879: Arrival

Queen Victoria crosses the bridge in the royal train, southbound from Balmoral. Soon afterwards she knights Thomas Bouch, at the height of his fame, just six months before his bridge falls.

28 December 1879: Disaster

At about 7.15 pm in a violent gale, the 5.20 train from Burntisland passes the Wormit signal box and moves onto the high girders. Watchers on the shore see sparks and two or three flashes, then the lights are gone, and the central spans, the engine and its five carriages and van fall into the Tay. Everyone aboard dies, at least 59 identified and perhaps as many as 75, and nobody actually sees the bridge fall.

29 December 1879: Other

By morning it is clear there will be no survivors, and the search begins with local fishermen, mussel-dredgers and Dundee whalers. Miss Annie Cruickshank is the first body to wash ashore, at Newport, and mailbags washed up at Broughty Ferry are the first proof of the train's fate. The last bodies turn up weeks and months later, one near Wick, nearly four months afterwards, and only 46 are ever recovered.

3 January 1880: Other

The Court of Inquiry takes its first evidence in Dundee, under Henry Cadogan Rothery with William Yolland and William Henry Barlow. Bouch's side blames the wind and a collision theory, while witnesses describe cracked castings, loose ties and a bridge that swayed. Hearings continue in Dundee and Westminster until May.

June 1880: Other

The court reports. Yolland and Barlow find the bridge badly designed, built and maintained, and put the blame on Bouch for ignoring wind pressure, while Rothery's separate report is sharper still. Bouch is disgraced and dies within the year, and the report forces engineers to take wind loading seriously, including on the Forth Bridge.

6 July 1883: Construction

Work begins on a replacement bridge, designed by William Henry Barlow and built by William Arrol and Company. It is double track, lower, with sturdier piers, and it reuses the undamaged old girders to save money.

13 July 1887: Construction

The new bridge opens beside the stumps of the old, which are kept as breakwaters to shelter the new piers. It restores the rail link and the water pipe to the Fife side, and it still carries trains today.

2013: Commemoration

Memorials naming the known victims are unveiled on both sides of the river, at Wormit and in Dundee. The old piers still show above the water beside the present bridge, and an annual remembrance walk marks the night.