Swing Bridge, River Tyne

At its height the Swing Bridge turned some 6,000 times in a single year (1924), letting sea-going ships pass up the Tyne to William Armstrong's Elswick works and onward. Its 281 ft moving span, weighing 1,450 tons, was among the largest of its kind when it opened in 1876. It was driven by Armstrong's hydraulic engines, which still survive. It links Newcastle and Gateshead on the site of the medieval bridge of 1270 and the Georgian bridge of 1781, and probably of the Roman Pons Aelius. Shipping above it has dwindled, the last swing for river traffic came in 2019, and by 2021 it could no longer swing at all. It is Grade II* listed and also a scheduled monument, and is known simply as the Swing Bridge, or the Newcastle Swing Bridge.

Timeline

1270: Construction

A stone bridge is raised across the Tyne on this spot, tying Newcastle to Gateshead for the next five centuries. It probably replaces the Roman crossing of Pons Aelius, and a later bridge of 1781 will take its place. Every crossing here sits low on the water, so tall ships can go no further upriver.

1781: Construction

A new Georgian stone bridge replaces the medieval one at the same crossing. Its low arches keep large vessels downstream of Newcastle, and as ships grow bigger a century later it comes to be called an intolerable obstacle to the river.

1868: Construction

Work starts on a swing bridge for the Tyne Improvement Commissioners, so that sea-going ships can reach William Armstrong's Elswick works upriver. The old bridge is cleared away, John Ure, the Commissioners' engineer, having proposed a low-level replacement, and Armstrong's firm builds the superstructure and its hydraulic machinery. The Commissioners, not Armstrong, pay the bill, about £240,000. The work takes eight years.

15 June 1876: Founding

The Swing Bridge opens to road traffic on 15 June 1876. Carts and pedestrians can now cross between Newcastle and Gateshead on a deck 7.3 metres wide, while the great iron span waits to turn for the first ships.

17 July 1876: Voyage

On 17 July 1876 the bridge swings for shipping. A coal wherry goes through first, then the Commissioners' steam launch and Armstrong's steam wherry Bee. The Italian transport Europa follows, guided by tugs to Elswick through crowds packing the High Level Bridge and the Quayside. She is sent to collect Armstrong's 100-ton gun, built for the Italian government, and her passage is drawn for the Illustrated London News on 29 July.

1907: Death

Thomas Ferens, known as Tommy on the Bridge, dies. Blind from childhood, he had stood on the old Tyne Bridge and then on the Swing Bridge after it opened, in all weathers, and local newspapers record the affection Tynesiders had for him.

June 1922: Renovation

Sir W. G. Armstrong Whitworth and Company carries out the first major structural repairs since the bridge opened, nearly half a century earlier. The iron span has been worked hard by the river's shipping.

1924: Other

In its busiest year the bridge rotates some 6,000 times to let vessels through. It is the peak of river traffic above the Swing Bridge, and traffic falls from then on.

1952: Voyage

The 5,000-tonne motor vessel Fernmount squeezes through the southern channel, the largest ship ever recorded to pass the bridge. Ships normally use the northern channel.

1959: Renovation

Electric pumps take over from the steam-driven ones that fed the hydraulic system. Armstrong's original hydraulic engines stay in place and still turn the span, and they remain in use afterwards.

1988: Performance

The final episode of the children's television serial Geordie Racer, part of the BBC schools series Look and Read, reaches its climax on the Swing Bridge, which gives the bridge a place in the memory of a generation of schoolchildren.

May 2016: Disaster

Fire breaks out on the pontoon beneath the bridge in May 2016. It covers about 20 square metres, and two fire crews and a fire boat are called to put it out.

2018: Renovation

A renovation costing £200,000 gives the Victorian structure 25,000 hours of work and 10,000 new screws.

2019: Other

2019 is the last year the bridge swings for river traffic. The Port of Tyne says there is no longer a need for it to open for shipping, and the bridge Armstrong built to let ships upriver is no longer wanted by them.

August 2021: Other

The bridge reopens in August 2021 after closure, but technical faults leave it unable to swing. A campaign to save the mechanism follows.

17 July 2026: Commemoration

Newcastle and Gateshead councils and the Port of Tyne mark 150 years since the bridge first swung, with information boards at both ends and an exhibition at the Discovery Museum. The span is still stuck, and a feasibility study is under way to see whether it can be made to turn again. The steam pump that once drove it stands in the museum.