Stanley Ferry Aqueduct

A rare thing: a river navigation that crosses its own river by aqueduct. At Stanley Ferry near Wakefield, the Aire and Calder Navigation is carried over the River Calder in a cast-iron trough hung from two great arches, with a span of about 50 metres. George Leather designed it with Thomas Telford's help and H. McIntosh built it between 1836 and 1839. It is reputed to be the largest cast-iron aqueduct in the world and one of the earliest through-arch bridges. A wider concrete aqueduct stands beside it since 1981, and the old one still carries boats.

Timeline

1836: Construction

Work begins on carrying the new Wakefield line of the Aire and Calder Navigation over the Calder. George Leather's first plan, a six-arch crossing approved with Thomas Telford's help, is dropped because so many piers would choke the river in flood. In its place comes one great cast-iron trough hung from two arches, built by H. McIntosh.

1839: Construction

The aqueduct opens, and boats cross the Calder on a trough of about 1,700 tonnes. The finished trough holds some 940 tonnes of water, hung from the arches by 35 wrought-iron rods. The same year the navigation's straighter four-mile cut, deepened to seven feet, takes traffic away from the river's winding course.

1863: Other

Coal from the local collieries starts to be loaded at Stanley Ferry into Tom Pudding tub boats. Linked in long trains, they travel the navigation to Goole, passing over the aqueduct on the way. The trade runs until 1985.

1879: Construction

A bridge replaces the ferry that gave the place its name. The ferry had been needed once the water was deepened for navigation, and now road traffic crosses the Calder without it.

1981: Construction

A second aqueduct of prestressed concrete is built beside the iron one, because the old structure is failing. It is wider, to carry heavy freight barges with less risk of collision damage, and the cast-iron aqueduct is left to leisure boats.

c. 1986: Renovation

The old aqueduct is refurbished: corroded hangers are replaced and all of them re-tensioned, the trough is repaired and the ironwork repainted. Today it stands floodlit beside its concrete neighbour, a Grade I listed structure still carrying boats over the Calder.