Stanford-le-Hope railway station

Stanford-le-Hope railway station serves the Essex town of Stanford-le-Hope on the London, Tilbury and Southend line, now run by c2c. It opened in 1854 as Horndon, the temporary terminus of the London, Tilbury and Southend Railway, and had taken the name Stanford-le-Hope by 1856. It passed to the Midland Railway in 1912, the LMS in 1923 and British Railways in 1948, and its level crossing, goods yard and platforms were reshaped repeatedly over the years.

Timeline

September 1854: Founding

The London, Tilbury and Southend Railway opens a station here under the name Horndon. Trains from Fenchurch Street run out to the new station, and for the moment the line ends here.

1 June 1855: Other

The line is pushed on towards Leigh, ending the station's year as the end of the line. The new section is laid as single track but is doubled before it opens.

November 1856: Other

Bradshaw's timetable now lists the station as Stanford-le-Hope rather than Horndon. Four trains a day each way run between Fenchurch Street and Southend by way of Tilbury Riverside, the line to Southend Central having opened that March.

1881: Renovation

The station is modernised around the level crossing. The platforms are extended across the road with movable sections that open and close for traffic, the first signal box goes up near the Pitsea end of the down platform, and a brick goods shed replaces the timber one.

7 August 1912: Transfer

The Midland Railway buys the London, Tilbury and Southend Railway, and Stanford-le-Hope becomes a Midland station.

February 1918: Disaster

Fire destroys the up platform. It is rebuilt on the south side of the level crossing, and the down platform is lengthened towards Pitsea.

1 January 1923: Transfer

Under the Railways Act 1921 the station passes to the London Midland and Scottish Railway. A new Midland-style signal box beside the level crossing follows with the re-signalling of 1924.

September 1939: Other

Soon after war is declared, the passenger service is cut back as a wartime economy.

June 1962: Other

The full electric timetable starts, worked mainly by Class 302 electric trains, after the line is electrified and re-signalled in the late 1950s. A new station building, put up over the winter of 1961 to 1962, greets the first electric services.

19 May 1985: Other

The signal box beside the level crossing closes, and the crossing is operated by CCTV from Pitsea. The crossing gates had already given way to barriers in November 1984.