St Peter's Church, Ridlington

The parish church of Ridlington in north-east Norfolk, standing on the boundary with Witton. It has a nave of the early 14th century, a later 14th-century chancel, a three-stage west tower of 1421 with weathered figures of the four evangelists at its corners, and a 13th-century octagonal Purbeck marble font. The chancel is unusual for a rare surviving thatched roof of Norfolk reed. It was heavily restored by the Victorians and damaged by a Zeppelin bomb in 1916.

Timeline

1300s: Construction

A church of flint stands here by the 14th century, its nave raised first and its chancel finished later in the same century. A 13th-century octagonal font of Purbeck marble, set on a double pedestal, shows that worship on the site is older still.

1421: Construction

The west tower rises in the new Perpendicular style, paid for by a legacy from Thomas Stacy, who also leaves money for the bells. Its corners carry sculpted winged figures of the four evangelists in place of pinnacles, so worn now that they are hard to read.

1760: Renovation

The east end of the chancel is rebuilt in red brick to hold the structure together. The builders use the tumbling technique, with brickwork set in sloping courses to carry the roof, which leaves the plain brick gable that still closes the church at its eastern end.

1860s: Renovation

Victorian restorers rework the nave and chancel, fitting new windows with intersecting tracery. They raise the chancel floor with rubble that includes reused medieval stone and floor tiles, laid over wet ground, a choice that will cause trouble a century and a half later.

24 April 1916: Disaster

Around midnight, during a Zeppelin raid on Norfolk, a bomb falls beside the church. The blast damages the chancel and blows out its stained glass, and livestock in the fields are killed, but nobody in the village is hurt. Only three small pieces of that glass survive, on the south side of the chancel.

2001: Renovation

The chancel floor begins to collapse. An investigation traces the fault to the Victorian raising of the floor, which used rubble and recycled medieval tiles over unprotected wet ground, and the floor is repaired and finished the same year.