Southend Central railway station
The original terminus of the London, Tilbury and Southend Railway, opened in 1856 and built inland from the seafront after residents of Royal Terrace opposed a station opposite the pier. It remained the line's eastern end until 1888, when the railway was extended on to Shoeburyness.
Timeline
1856: Construction
The London, Tilbury and Southend Railway opened its line to Southend, terminating at a station built inland after Royal Terrace residents blocked a seafront site.
1894: Renovation
Two additional platforms were built to cope with growing commuter traffic on the line into London.
7 August 1912: Transfer
The Midland Railway took over the London, Tilbury and Southend Railway, bringing the station under the control of a major national company for the first time. It had been run by the independent LT&SR since opening in 1856.
September 1939: Other
At the outbreak of the Second World War, special evacuation trains ran through the station carrying children out of the London area, while ordinary passenger services were cut as a wartime economy measure.
June 1962: Other
A full electric timetable began on the line, ending steam haulage of London services. It followed the 1954-59 redesign of the station's track layout and a new signal box with colour light signalling in 1960.