Setchey Oilfield
Setchey Oilfield, also known as Setch Oil Works or the West Winch oilfield, was an early twentieth-century attempt to extract and refine oil from the Kimmeridge Clay shale beds south of King's Lynn, Norfolk. Promoted by the geologist Dr William Forbes-Leslie and financed through the public company English Oilfields Ltd, formed in 1918, it grew into a large oil-shale mining and retorting works with its own pits, quarry, workers' housing and a railway branch to the Great Eastern main line. Despite investment approaching £1 million, the shale's high sulphur content made the recovered oil commercially unsaleable and the works never reached full production. The company nonetheless clung on for decades, retaining a presence at Setchey until the mid-1960s before finally being wound up in 1969. The site was later cleared and is now occupied by the Garage Lane industrial estate.
Timeline
1918: Discovery
Oily traces noticed in the Puny Drain and other watercourses near Setchey prompted geological investigation, which identified oil-bearing Kimmeridge Clay shale beneath the fields south of King's Lynn. The find, made amid post-war interest in a domestic fuel supply, triggered a wave of exploratory boreholes across the site.
July 1918: Founding
English Oilfields Ltd was registered in London with an initial share capital of £300,000 to exploit the Setchey shale, its prospectus fronted by the geologist Dr William Forbes-Leslie. Public enthusiasm for the scheme was intense: the company's capital was later increased to £1,500,000 as investors bought in.
1919: Construction
Fifty-three boreholes were sunk across the site to depths of up to 100 feet, and West Winch No. 1 pit - the first licensed shale mine in Norfolk - was dug alongside a second pit, a quarry, workshops, a canteen, dormitories and a powerhouse. By December 1919 a standard-gauge branch, Clarke's Drove siding, had been built to link the works to the Great Eastern Railway's King's Lynn to Ely line about a mile and a half away.
September 1920: Other
Eight retorts of three competing designs - English Oilfields, Fraser and Simpson types - were brought into operation to process the mined shale. The results were poor: only about three gallons of oil could be recovered from every twenty tons of shale processed, and even that oil was so heavily contaminated with sulphur compounds that it could not be sold.
1926: Other
With the retorts unable to yield saleable oil, English Oilfields Ltd abandoned its plans to complete the works and began disposing of plant. Directors later admitted to shareholders that an 'enormous loss' had been incurred through premature expenditure on plant that proved unsuitable for the shale, though the firm kept a presence on site.
1 June 1961: Destruction
The works' 160-foot chimney, by then the most conspicuous surviving structure of the abandoned oil-shale plant, was demolished.
19 February 1969: Other
English Oilfields Ltd was formally wound up at a final liquidation meeting held in London, more than fifty years after its prospectus had promised investors a new British oil industry. The Setchey works were subsequently cleared, and the site is now occupied by the Garage Lane industrial estate.