Sanger Building
The Sanger Building is the Department of Biochemistry's research building at the southern end of the Old Addenbrooke's Site on Tennis Court Road, Cambridge, designed by RH Partnership for the University of Cambridge and completed in 1997. It stands on the last undeveloped piece of the ground that held Addenbrooke's Hospital from 1766 until the hospital moved to Hills Road. It is named for the biochemist Frederick Sanger, a two-time Nobel laureate in Chemistry who worked in the department. It is also known as the Department of Biochemistry's Sanger Building.
Timeline
13 October 1766: Founding
Addenbrooke's Hospital opens its doors on Trumpington Street with twenty beds, paid for by the bequest of Dr John Addenbrooke. The ground it occupies will be a hospital for more than two centuries, long before any laboratory stands here.
1984: Transfer
The last patients leave the old Addenbrooke's buildings, which have been emptying since the new hospital on Hills Road began opening in 1961. The University of Cambridge now owns the old site, and its wards and grounds are cleared for new departments.
1995 to 1997: Construction
RH Partnership builds a 6,400 square metre home for the Department of Biochemistry on the last vacant piece of the old hospital ground, inside the central conservation area. It is designed for heavy research equipment, with space for NMR instruments, X-ray crystallography and electron microscopes, plus a 150-seat lecture theatre and a cafe.
1996: Other
While the new biochemistry building is going up, the university discusses naming it after Fred Sanger, the department's double Nobel laureate who won prizes in 1958 for the structure of insulin and in 1980 for sequencing DNA. The proposal is put to Professor Tom Blundell, the head of department, and the building takes Sanger's name.
1997: Occupation
Part of the Department of Biochemistry moves in from its cramped 1924 home in the Hopkins Building across Tennis Court Road. Research groups gain purpose-built laboratories on the old Addenbrooke's ground, and the building is complete at a cost of 12.75 million pounds.