Salisbury Cathedral

Bishop Richard Poore wanted to leave a cramped, windy hilltop where the cathedral's clergy were at odds with the royal garrison, and he built a new cathedral from nothing in the water meadows of the Avon. Begun in 1220 and consecrated in 1258, it is the Cathedral Church of the Blessed Virgin Mary, a leading example of Early English Gothic, unusually unified because it rose in one generation. The 404 foot spire, added in the early 1300s, is the tallest in England, and the cathedral houses the best preserved of the four surviving 1215 Magna Carta originals and a faceless medieval iron clock. Around it lies the largest cathedral close in Britain, and the city of New Salisbury grew up beside it. Also known as Salisbury Cathedral Church of the Blessed Virgin Mary and, for its predecessor, the cathedral of Old Sarum.

Timeline

1075: Founding

A church council at London makes Herman the first bishop of Salisbury, joining the sees of Sherborne and Ramsbury, and sets his seat inside the Norman castle ramparts at Old Sarum. The cathedral he is to build stands under the castle mound, where the bishop's authority will always be limited by the king's soldiers. That uneasy partnership is the root of everything that follows.

5 April 1092: Founding

The first cathedral at Old Sarum, finished under Bishop Osmund, is consecrated. Reportedly a storm damages it within days. In the next century and a half the clergy complain of soldiers barring the precinct gate, even on Ash Wednesday, and of brawls between clerics and garrison, of howling winds that drown out services, and of having to rent lodgings from laymen.

1215: Arrival

A copy of Magna Carta reaches the cathedral at Old Sarum, probably carried by Elias of Dereham, who was at Runnymede when King John agreed the charter and was charged with sending out copies. Elias later becomes a canon of Salisbury and oversees the building of the new cathedral, so the document is waiting for the move that he will help to direct.

c. 1218: Transfer

Pope Honorius III grants an indulgence that permits the move off the hill. A cardinal legate, Gualo, has inquired into the chapter's complaints and found them true. Richard Poore, brother of the Herbert Poore who had been refused years before, has just come from Chichester to be bishop and now has the authority his brother lacked.

1219: Founding

On the water meadows by the Avon, Poore raises a small wooden chapel of the Virgin, begun on Easter Monday. On Trinity Sunday he says mass there and consecrates a cemetery, claiming the ground before a stone is laid.

28 April 1220: Founding

Foundation stones are laid on 28 April, by Bishop Poore with William Longespée, Earl of Salisbury, and his wife Ela, before a great crowd said to have shouted and wept for joy. Elias of Dereham, who had helped build the shrine of Thomas Becket at Canterbury, is the canon who oversees the work. The ground is gravel over water, so the footings go down only about four feet.

1225: Construction

The east end, today's Trinity Chapel, stands complete. Building is paid for by donations, chiefly from the canons and vicars of south-east England, who are asked to give fixed yearly sums. The new town of New Salisbury is laid out on a grid beside the works.

1226: Death

William Longespée, who laid a foundation stone six years earlier, dies and becomes the first person buried in the new cathedral. He was an illegitimate son of Henry II and half-brother of King John. His tomb is opened in later centuries and, in a grisly tale the guides tell, a dead rat is found inside the skull. In the same year the old cathedral on the hill is formally dissolved.

September 1258: Other

Archbishop Boniface consecrates the cathedral in the presence of King Henry III and Queen Eleanor, thirty-eight years after the first stone. Nave, transepts and quire are done, giving the building its unusual unity of style. The west front, cloisters, chapter house, tower and spire are all still to come.

1263: Construction

Work begins on the octagonal chapter house, the cloisters having been started in 1240. Its slender central column carries the vault, and a stone frieze of Old Testament scenes runs around the walls. It will become the home of the cathedral's Magna Carta.

1310s to 1330s: Construction

A tower and a 404 foot spire rise over the crossing, finished around 1330, adding some 6,400 tons to a base never designed for it. The spire becomes the tallest in England and the cathedral's lasting signature. Over the centuries the weight bends the crossing piers and tilts the spire.

1331: Construction

Edward III permits the clergy to wall the Cathedral Close with stone taken from the abandoned cathedral at Old Sarum. The old hill thus feeds the new, and the precinct becomes a walled city within the city, with its own constables and liberty.

1360: Disaster

A storm damages the spire, and a wooden scaffold is built inside it to strengthen it. The timbers of that repair are still there, and visitors on the tower tour climb past them.

c. 1386: Invention

An iron clock with no face, which strikes only the hours, is installed in the detached bell tower, and a deed of 1386 mentions the tower that houses it. It is long claimed as the oldest working mechanical clock in the world, though its date is disputed. It strikes through the centuries to call the clergy to services.

1445: Construction

A library and lecture room are built above the east cloister walk. Its books, many brought down from Old Sarum, are chained to the shelves. The library survives and now holds 193 manuscripts and some 12,000 early printed books.

1457: Conversion

The Pope declares Osmund, the bishop who finished the first cathedral at Old Sarum, a saint. His tomb and shrine in the new cathedral draw sick pilgrims hoping for cures. Two grand chantry chapels follow at the east end, for Bishop Beauchamp and Lord Hungerford, where masses are sung for their souls.

1540s: Other

The Reformation strips the cathedral. Osmund's shrine, the precious metalwork, vestments and religious images are destroyed, prayers for the dead stop, and the Sarum Rite, the form of worship born at Old Sarum, is dropped. Daily services fall from seven to two, and from 1549 the English Book of Common Prayer is used.

1621: Death

Edward Seymour, Earl of Hertford, dies and is buried here. He had secretly married Katherine Grey, sister of Lady Jane Grey, and the most opulent tomb in the cathedral, in the south aisle, commemorates them both. Katherine's effigy is raised above his, a nod to her royal blood.

1640s to 1660s: Occupation

After the Civil War the Commonwealth abolishes bishops, deans, the chapter and the choir, and the city authorities run the cathedral with worship stripped of singing. Royalist soldiers set the separate bell tower on fire, and the cloisters are damaged when used as a prison. A wealthy local family secretly pays workmen for repairs until the monarchy returns in 1660.

August 1668: Other

Sir Christopher Wren surveys the cathedral and finds the spire leaning about 30 inches out of true. He prescribes iron bands and tie-beams to hold the crossing together, and they are hidden above a false ceiling. The cathedral still measures the floor every two years to watch for movement.

1778 to 1779: Renovation

The cathedral closes for nearly two years while the fixed nave seating is removed and the quire is altered to feel warmer and more intimate. A window showing Moses and the bronze serpent is set in the east end.

1789 to 1792: Renovation

James Wyatt is let loose on the cathedral to bring in light and space. The Beauchamp and Hungerford chantry chapels are pulled down, along with the free-standing bell tower, and the old graveyard is drained to make the open green of the Close. The medieval rood screen goes too, and the clock from the bell tower is moved into the central tower.

September 1792: Other

The cathedral reopens in September with King George III, Queen Charlotte and six princesses attending. The king presents a new organ by Samuel Green, a gift he has made to the remodelled building.

c. 1825: Other

John Constable paints the cathedral from the bishop's grounds for Bishop John Fisher, who commissioned the picture and appears with his wife at the bottom left. It follows Turner's view from the cloisters of 1802 and fixes the spire in the English imagination.

1855 to 1859: Renovation

William Burges redecorates the chapter house, and the Genesis and Exodus scenes of Adam and Eve, Noah, the Tower of Babel and the patriarchs are restored in the frieze. The refit is part of a wider Victorian restoration, in which Sir George Gilbert Scott repairs the west front.

1877: Other

Henry Willis builds a new organ, paid for by Julia Chafyn Grove. It is still the cathedral's organ, with 55 stops, and has been restored since, most recently in 2019 and 2020.

1928: Discovery

The old iron clock, silent since a new clock replaced it in 1884, is found stored in the tower by the horological enthusiast T. R. Robinson, who believes it is the 1386 clock. John Smith and Sons of Derby restore it in 1956, fitting a reproduction early escapement. It now stands working in the north nave aisle.

1985 to 2023: Renovation

A restoration of the exterior stonework starts in 1985 and runs for 38 years under scaffolding. When it ends in 2023 the whole exterior is visible for the first time in nearly four decades.

September 2008: Commemoration

In the 750th anniversary year of the consecration, William Pye's font is installed in the nave: a ten foot wide basin of still water, the largest working font in a British cathedral, costing £180,000 from donors. It mirrors the vaulting overhead, and some parishioners object that it is change for change's sake.

2018: Other

A man tries to steal the Magna Carta from the chapter house, and alarms sound as he breaks the outer layer of its glass case. The document is unharmed and he is detained, and in January 2020 Mark Royden of Kent is found guilty, the damage costing £14,466.

16 January 2021: Other

The cathedral becomes a Covid vaccination centre, the day after Lichfield Cathedral, and organ music plays while people are vaccinated. Eight centuries on, it is again a refuge for the town.