River Welland

The river on which Spalding stands, crossed in the town centre by High Bridge. Severe Fenland flooding in 1947, which breached the river's banks and inundated thousands of acres of farmland, led to the construction of the Coronation Channel around the east side of the town, protecting Spalding from further flooding.

Timeline

1838: Construction

High Bridge, carrying the road across the Welland between Bridge Street and Church Gate in the heart of the town, was rebuilt.

21 March 1947: Disaster

A combination of heavy snowmelt, high tides and rain caused the Welland to breach its banks near Spalding, flooding huge areas of the surrounding Fens and leaving farmland and homes under water for weeks.

1953: Construction

In response to the 1947 floods, the Coronation Channel was built around the east side of Spalding as a relief channel, linking the tidal Welland at Marsh Road Sluice to the non-tidal river at Clay Lake and ending the town's recurrent flooding.