River Nene
At its height the Nene carried the wheat of the Fens out through Wisbech, a port whose cargo rose from 63,180 tons in 1830 to 159,678 tons in 1845 after a new outfall cut straightened the river's last miles. The river runs 105 miles from Arbury Hill near Badby in Northamptonshire to the Wash, and has been worked for navigation and drainage since the Middle Ages by bishops, Dutch engineers, commissioners and catchment boards. Its straight leams, locks and sluices are largely artificial, and the old meandering course survives as the Old Course. The name, pronounced 'Neen' near Peterborough and 'Nen' at Northampton, is pre-English and its origin unknown; it was also spelled Nenn or Nyn in older maps. Floods in 1978 and the high tide of 2013 shaped the flood walls that now line Wisbech's banks.
Timeline
1164: Other
Thomas Becket, Archbishop of Canterbury, slips out of Northampton Castle and is said to hide at Hardwater Mill beside the Nene. From the river valley he makes his way on to the coast and flees to France. The mill, mentioned in Domesday Book, goes on grinding flour for almost a thousand years.
1470s: Construction
Bishop John Morton of Ely cuts Morton's Leam, a straight channel carrying the Nene from Peterborough to Wisbech. It is the first great straightening of the river through the fens, and it is improved again in 1570 and 1631.
1631: Construction
The Dutch engineer Cornelius Vermuyden builds a sluice at Wisbech as part of the work on the lower river. Holding back the tide at the town becomes a theme that will return for centuries.
1728: Construction
The Bedford Level Corporation cuts Smith's Leam, a straight channel taking the Nene from Peterborough to Guyhirn. It becomes the main river, and the old meandering course is left as the Old Nene.
1730: Construction
Robert Wright and Thomas Squire finish making the Nene navigable from Peterborough up to Oundle, under an Act of 1724 that lets contractors recoup their costs from tolls. Squire carries the work on to Thrapston by the end of 1737.
1742: Construction
England's first water-powered cotton spinning mill is installed beside the Nene at Northampton, on the site of an old corn mill south-west of the town centre. The river now drives industry as well as barges.
7 August 1761: Construction
Northampton celebrates the opening of the river to the sea. John Smith of Attercliffe has built twenty pound locks and twenty horse-haulage bridges for £14,070 between Thrapston and the town, opening in stages over three years.
1797: Construction
The Wisbech Canal opens, joining the Nene at Wisbech to Well Creek at Outwell and so to the Great Ouse. It is filled in during the 1960s.
1815: Construction
A navigable link joins the Nene at Northampton to the Grand Junction Canal, built from 1812 to 1815 under Benjamin Bevan at a cost of £35,000. Its 17 locks drop 107 feet over about five miles, replacing the tramway that had bridged the gap since 1805.
1830: Construction
The Nene Outfall Cut carries the river straight to the Wash below Sutton Bridge, authorised by the Nene Outfall Act of 1827. Wisbech Corporation, which had long opposed the plans of John Rennie and Thomas Telford, contributes £30,000, and contractors Jolliffe and Banks build it for £149,259.
1845: Other
Cargo through the Port of Wisbech reaches 159,678 tons, up from 63,180 in 1830. The new outfall has made the town a real port.
December 1848: Disaster
Serious flooding in December 1848 shows how badly the lower river has decayed. The engineer James Rendel reports that £120,000 of work is needed below Peterborough, and the 1852 Act that follows sweeps away the old tangle of navigation commissions.
1852: Renovation
Under the Nene Valley Drainage and Navigation Improvement Act, dams go up at Waldersea and Guyhirn, an underwater weir is built below Wisbech bridge, and a new iron swing bridge replaces the old crossing in the town. The works silt and hinder the river that Wisbech's trade depends on.
1859: Other
Wisbech Corporation sues the drainage commissioners over the dams and wins at first. Gangs of men then destroy most of the Waldersea dam overnight, and when the commissioners' appeal in Chancery fails, the dams and the Wisbech weir are removed.
9 June 1881: Disaster
The outer wall of the new Sutton Bridge dock collapses, days before its planned opening. The 13-acre dock costs £160,000 to repair and the whole scheme fails.
1930s: Renovation
The Nene Catchment Board, formed under the Land Drainage Act 1930, takes over a river described as in unparalleled decay. It rebuilds every lock, builds a new lock and sluice at Dog-in-a-Doublet, blows up the Northey Gravel shoal with dynamite, and piles two miles of Wisbech's banks with a new quay and a concrete portal bridge, the largest in the country.
11 January 1978: Disaster
A North Sea storm surge sends the tide over the Nene's banks on both sides at Wisbech. A 70-year-old woman drowns in her home and about 1,000 people are evacuated.
1980s: Construction
After the flood, Wisbech's river banks are raised by about 1.5 metres, railings give way to flood walls and a series of flood gates is built. The town is shut off from the river that drowned its streets.
10 April 1998: Disaster
Torrential rain on 8 and 9 April sends the Nene to its peak on Good Friday, flooding Northampton, Wellingborough and Earls Barton. Cotton End, Far Cotton and St James End suffer worst, and the town later gets a siren warning system and stronger embankments.
December 2013: Other
A surge tide brings the Nene to within inches of the tops of Wisbech's flood walls and traffic stops on North End Road. The walls, upgraded in a £12 million scheme, protect 10,590 residents and 1,200 businesses, and the river stays in its channel.