Queen Elizabeth II Bridge
At its opening in 1991 this was the longest cable-stayed span in Europe, and the first Thames bridge downstream of central London since Tower Bridge in 1894. It carries the southbound lanes of the Dartford Crossing between Thurrock in Essex and Dartford in Kent, while the older tunnels take traffic north. Designed by the German engineer Hellmut Homberg, who died the year before it opened, it was one of Britain's first privately financed road schemes. Planned as the Dartford Bridge, it took the Queen's name as a compromise with Thurrock residents who wanted Tilbury Bridge. Today it is known as the QEII Bridge or the Dartford Bridge, and its tall pylons dominate the marshes and the traffic tailbacks beneath.
Timeline
1986: Other
With the M25 finished and the Dartford tunnels clogged, a Trafalgar House consortium wins the bid to build a new bridge beside them. Its price is put at £86 million. The idea is that private money builds the crossing and tolls pay it back.
31 July 1988: Transfer
Control of the crossing passes from Kent and Essex county councils to a private firm, Dartford River Crossing Limited, under the Dartford-Thurrock Crossing Act 1988. The company must carry the bridge's debt until tolls clear it. Its shareholders include Trafalgar House, Kleinwort Benson, the Prudential and Bank of America.
August 1988: Construction
Work starts within days of the transfer. Two vast concrete caissons are built in a Dutch dry dock, towed across the North Sea and sunk either side of the shipping channel, each designed to survive a 65,000 tonne ship strike. Above them the concrete piers are slip-formed, poured day and night for ten days and nights per column, under a general foreman, Dennis McNally, who supervises about 56 men.
c. 1989: Discovery
A Second World War bomb turns up in the path of the Essex approach road. The whole crossing shuts, and the M25 backs up for miles in both directions. Up on a tower, McNally cannot get home until a safety boat ferries him across the river.
30 October 1991: Founding
Queen Elizabeth II opens the bridge that bears her name, for about £120 million including £30 million of approach roads. Its 450 metre main span, held by 56 pairs of cables, makes it the longest cable-stayed span in Europe. It takes the southbound lanes, leaving the tunnels to northbound traffic. The Thurrock objection to 'Dartford Bridge' ends in a compromise on the Queen's name.
31 March 2002: Transfer
The construction debt is agreed to be repaid, ending the private concession well inside its 20 years. The crossing returns to state hands. The bridge has paid for itself through tolls.
1 April 2003: Other
Drivers expecting free passage find the toll has been renamed a charge. It stays in force to manage traffic, and the renaming also sidesteps the VAT that a toll would attract. The old toll booths keep working for another eleven years.
12 February 2014 to 14 February 2014: Other
Winter storms with 60 mph winds close the bridge on 12 February, and again on the evenings of 13 and 14 February. Traffic is forced into both tunnels and the roads around them, the very pinch the bridge was built to ease.
30 November 2014: Transfer
The toll booths come down and Dart Charge begins, with drivers paying online or by account and number-plate cameras doing the checking. The barriers that had stopped traffic since the bridge opened are gone.
29 October 2021: Commemoration
Thirty years after opening, the bridge carries over 150,000 vehicles a day against a design capacity of 65,000 for the bridge itself. Nearly 1.5 billion vehicles have crossed the Thames here since the first tunnel opened. Officials point to the proposed Lower Thames Crossing as its successor.