Queen Elizabeth Hospital, King's Lynn
The Queen Elizabeth Hospital (QEH) is the district general hospital for West Norfolk, on the edge of King's Lynn. It opened in 1980 to replace the West Norfolk and Lynn Hospital, founded in 1835 on Hospital Walk. Its flat roofs were built with reinforced autoclaved aerated concrete (RAAC), which became a serious safety problem in the 2020s and led to the government's decision to rebuild the hospital. Its royal links include treatment of the Queen Mother and Queen Elizabeth II, who lived nearby at Sandringham. It is often called the QEH.
Timeline
1835: Founding
The West Norfolk and Lynn Hospital is founded on Hospital Walk in King's Lynn. For nearly a century and a half it serves the town and its rural hinterland, and it is the institution the later Queen Elizabeth Hospital is built to replace.
1980: Construction
The Queen Elizabeth Hospital opens as a modern two-storey district general hospital, taking over from the old Hospital Walk site. Its roof is made of RAAC planks, a lightweight concrete that seems economical at the time but will later cause great trouble.
February 1998: Other
The Queen Mother, who has fractured her hip at nearby Sandringham House, is brought to the hospital. She is soon moved on to King Edward VII's Hospital in London. She returns to Lynn late in January 1999 to have nosebleeds cauterised.
11 January 1999: Other
Queen Elizabeth II visits to open the Arthur Levin Day Surgery Centre. She returns in her Golden Jubilee year, 2002, to open the new £1.2 million Macmillan Cancer Unit.
January 2003: Other
The Queen herself becomes a patient, admitted from Sandringham for a knee scan. The scan shows torn cartilage, and she is transferred to King Edward VII's Hospital in London for surgery.
October 2013: Other
The Care Quality Commission puts the hospital trust in its highest risk category, as a predicted £14 million deficit deepens its troubles. Monitor later places it in special measures, and a contingency planning team is sent in during March 2014.
2018: Other
The hospital is put back into special measures, mainly over maternity services, after leaving them in 2015. Staffing gaps of over 40% on some wards bring talk of suspending non-urgent surgery, and in February the trust applies for a £22 million loan to replace its failing roof.
March 2021: Disaster
The RAAC roof planks are declared structurally unsafe, and hundreds of jack posts are installed to hold the ceilings up. In April the critical care unit is evacuated and closed while steel supports go in. A rebuild bid had already been turned down by the Treasury in 2020.
February 2022: Other
The hospital comes out of special measures, with over 500 beds and about 4,000 staff and volunteers. Its building problems remain unsolved.
25 May 2023: Other
The government announces that the hospital will be rebuilt because RAAC is so widespread across the site. It is added to the new hospitals programme, and demolition work begins in June ahead of the new building.