Pulteney Bridge
William Pulteney, a frugal Edinburgh lawyer, wanted to build a town on his wife's Bathwick meadows, and to reach them across the Avon he built a bridge lined with shops, in the manner of the Ponte Vecchio and Palladio's unbuilt Rialto design. Robert Adam took over a rejected Bristol plan in 1770 and the bridge opened to tenants in 1773 and 1774, named for Frances Pulteney, who had inherited the estate. The Bathwick scheme stalled, floods wrecked the north side around 1800, and Adam's street fronts were spoilt by later alterations before restorations in 1951 and 1975. It is now a Grade I listed bridge with shops on both sides of its full span, one of very few in the world, and the weir below it is a favourite film location.
Timeline
February 1768: Founding
William Johnstone Pulteney, an Edinburgh lawyer whose wife Frances has just inherited the Bathwick estate, goes to Bath's Corporation with a plan for a bridge. Bathwick is 600 acres of meadow cut off from the city by the Avon, and the only way across is a ferry. He means to build houses there, and a bridge is the key to it.
1769: Other
Pulteney wins an Act of Parliament for the Bathwick development, and a bridge designed by Thomas Paty of Bristol is drawn up. It is a plain crossing about 9 metres wide, estimated at £4,569, and it is abandoned before it rises. Building begins this year, but winter weather stops work on the piers before either design is under way.
c. 1770: Other
Robert Adam and his brother James take over the design in the summer, and the bridge changes from a plain crossing to a Palladian one. Adam answers Andrea Palladio's rejected Rialto design with a bridge carrying a row of shops down each side, and it is widened to about 15 metres after the Corporation complains that it is too narrow. The Corporation also thinks bridge houses are old-fashioned, since London and Bristol have cleared theirs, but Pulteney stays adamant, counting on the shop rents to repay the cost.
c. 1773: Construction
The bridge is ready for tenants by late 1773, with three equal arches over the Avon and eleven shops down each side, at a cost of around £11,000. It is finished in 1774, but the tenants are slow to come. Beyond its far end lie only meadows, not the town that Pulteney hoped for.
1775: Other
The American War of Independence shelves the plans for Bathwick, and the bridge stands for years as a road to open fields. Not until March 1788 does building start on the estate, when Thomas Baldwin supplies detailed plans.
26 March 1792: Renovation
Most of the bridge is let on lease, and Thomas Baldwin begins converting the shops to different designs, in less than a month after Robert Adam's death. His alterations enlarge the shops and change the street fronts that Adam designed. Later writers call the results pathetic travesties of the original, and the bridge stands for under twenty years in the form Adam created.
September 1799: Disaster
High floods bring down a pier of the bridge, whose piling is too weak. The north side begins to fail, and the bridge's future is in doubt.
November 1800: Disaster
A great storm brings down the second pier, and the damage leaves the north side of the bridge ruined. Pulteney considers pulling it down for a single-span cast iron bridge designed by his protégé Thomas Telford, but it is not done.
1804: Renovation
The estate surveyor John Pinch rebuilds the failed side, having begun repairs in 1802 when the shops on the north side were taken down and rebuilt. The western mid-stream pier is rebuilt, and the bridge is saved in a less ambitious form. The pavilions at either end become little more than token pediments.
1895: Renovation
To make way for the new Grand Parade, the western pavilion is moved eastward over the arch, which leaves the downstream front unbalanced. Further changes follow in 1903, when the south-west end is altered for road widening and the replacement is not an exact match.
January 1936: Other
The bridge is scheduled as an ancient monument. The next year the City Surveyor traces Adam's plans and designs a restored south front, with the aim of undoing the Georgian and Victorian damage.
1951: Renovation
The restored south front is completed in time for the Festival of Britain. The north side, with its shops jutting out over the water, stays a stark contrast to it and is not properly opened to view until about 1990.
1968: Disaster
Another great flood hits Bath, and its height is marked on the river wall. It follows the severe flood of 1960 and is part of what drives the city to rebuild the weir beneath Pulteney Bridge.
1972: Construction
The horseshoe weir just below the bridge is rebuilt between 1968 and 1972 as part of the Bath flood prevention scheme, to speed the river away from the city. The new weir raises the water level at the bridge and changes how its arches look from downstream.
1975: Renovation
The Georgian Group and Bath City Council restore the upper structure and the south street front for European Architectural Heritage Year, with the architect John Vivian. It is a partial recovery of Adam's lost design.
September 2011: Other
Bath's council drops its plan, first put forward in 2009, to close the bridge to motor traffic and make it a pedestrian street. Buses, taxis and bicycles still cross it today, among shops that Adam designed, and walkers cross beside them.
October 2012: Performance
Russell Crowe films Javert's suicide for the film of Les Misérables at the weir below the bridge, with the Seine and Paris added behind the parapet. Bath's weir stands in for the river in Paris.