Peterborough Cathedral Nave Ceiling

The painted wooden ceiling over the nave of Peterborough Cathedral is the only surviving ceiling of its type in Britain and the largest of four such medieval wooden ceilings in Europe. It runs about 62 metres long and 11 metres wide, some 25 metres above the floor, and is covered in diamond lozenges of kings, bishops, saints, the liberal arts, musicians and vices. Built in the 1230s and 1240s in the time of Abbot Walter of Bury St Edmunds, it was repainted in the 1740s and 1830s and conserved between 1998 and 2003. Also called the Painted Ceiling of Peterborough Cathedral.

Timeline

1180s: Construction

Carpenters raise the great timber roof over the nave, probably in the 1180s. It will carry the painted ceiling nearly sixty years later, and its oak is dated by tree rings.

c. 1238: Construction

In the abbacy of Walter of Bury St Edmunds (1233 to 1245) the nave ceiling is built, most likely in the late 1230s or the 1240s. Its riven oak boards, felled in northern Germany no earlier than 1238, are laid clinker fashion, following the transept ceilings made a little before. Painters cover the boards with three interlocking rows of lozenges showing six kings, five bishops, Saints Peter and Paul, the Lamb of God, the seven liberal arts, musicians, a vice, and the sun and moon in chariots.

1740s: Renovation

The ceiling is repainted for the first time, in the 1740s. The work follows the old scheme, though the border differs from the medieval one, and a faint fox beneath a later dragon shows how the figures were altered.

1830s: Renovation

In the 1830s the architect Edward Blore replaces the original oak beams, hanging the ceiling from wrought iron bolts, and it is repainted a second time. A modern study judges both repaintings extensive and inept, yet the medieval pattern survives beneath.

c. 1849: Publication

The architect and watercolourist William Strickland publishes a lithographic copy of the ceiling, printed by Day and Son from drawings lithographed by John Sleigh. Its folded colour plate, over six feet long, spreads seven panels of the nave in the original lozenge design.

1998: Renovation

After worries over its condition in the 1990s, a conservation programme begins on the ceiling, its medieval roof and the earlier transept ceilings. Paint and wood conservators, art historians and tree-ring specialists work through five phases, backed by English Heritage, the Pilgrim Trust and the Cripps Foundation.

22 November 2001: Disaster

A stack of plastic chairs catches fire in the cathedral, and smoke pours through the building. Crews put out the flames in about 25 minutes, and the cathedral was told it was minutes from a fireball that would have been catastrophic for the wooden ceiling. Smoke damage halts the conservation work, and the transept ceilings are treated afterwards from July to October 2002.

2003: Renovation

The conservation programme ends. Roughly a third of the ceiling's boards, about 2,170 in all, have been replaced over the centuries, and the tree-ring study now places the felling of the oak and the painting in the 1230s and 1240s.