Pero's Bridge

Pero's Bridge is a horned, lifting footbridge across St Augustine's Reach in Bristol's Floating Harbour, joining Queen Square to Millennium Square. Opened in 1999 and designed by the Irish artist Eilis O'Connell with Ove Arup & Partners, it is named for Pero Jones, an enslaved man brought from Nevis to the household of the merchant John Pinney, and for years it was the city's only physical recognition of Bristol's part in the slave trade. Its horn-shaped counterweights earned it the nicknames Horned Bridge and Shrek's Bridge. In June 2020 the toppled statue of Edward Colston lay in the harbour just south of it. Rusting and weighed down with love locks, it jammed in August 2026 and partly collapsed in October.

Timeline

1783: Arrival

Pero Jones arrives in Bristol from Nevis, brought by the merchant John Pinney, who owns him. He serves in Pinney's household in Great George Street as a manservant and lives out his life in the city, dying in 1798. Two centuries later a harbour bridge will carry his name.

1999: Construction

A new footbridge opens across St Augustine's Reach, linking Queen Square with the Millennium Square development. The artist Eilis O'Connell designs it with engineers Ove Arup & Partners, and Paul Boateng MP, then a Home Office minister, performs the opening. Its centre span lifts for boats on the weight of two horn-shaped counterweights.

1999: Commemoration

The council's leisure chair, Paul Smith, names the bridge after Pero Jones as a memorial to Bristol's enslaved. Liberal Democrat councillor Stephen Williams calls it a gesture and demands a statue or a purpose-made memorial, and the row reaches the front page of the Evening Post. Even the designer remarks that the name sounds a bit political.

7 June 2020: Other

Protesters pull down the statue of the slave trader Edward Colston, roll it down to the harbour and push it in, where it lies just south of the bridge. The bridge named for an enslaved man becomes the backdrop to the day's best-known act. Council workers lift the statue out on 11 June, and it later goes on show lying down at M Shed with its graffiti kept.

July 2025: Other

An inspection finds major structural problems, and the council imposes a one tonne weight limit and a no lift notice. The bridge, long hung with love locks, is by then carrying hundreds of padlocks, which the council suspects are adding to the strain. In September the council seeks to reallocate £200,000 for repairs and strips off nearly three tonnes of padlocks.

13 August 2026: Disaster

On the morning of a routine test of the lifting mechanism, the central section drops suddenly and sits misaligned. The bridge is closed to pedestrians and boats, and Bristol Ferry Boats shut their landing at Cascade Steps. Engineers had already warned of rust and the risk of the lifting section sticking.

31 October 2026: Disaster

At about 11pm the centre span slips again and part of the walkway falls into the harbour, one horn sculpture going under. No one is hurt, and a small hydraulic oil leak near the Arnolfini is cleared. The damaged section is to go to Albion Dry Dock, and the council hopes to reopen the refurbished bridge in spring 2027.