Our Lady Queen of Heaven, Dovercourt
Roman Catholic church on Fronks Road, Dovercourt, in the Diocese of Brentwood, opened in 1955 and designed by R. A. Boxall. It continues a Catholic mission founded at Harwich in 1864, whose Pugin-designed church of 1869 beside the railway station was wrecked by the 1953 flood. The parish is now part of the Harwich and Dovercourt parish.
Timeline
16 July 1864: Founding
A Catholic mission is founded at Harwich, and a temporary chapel opens on the feast of Our Lady of Mount Carmel, to which it is dedicated. Fr Thomas Parkinson is the mission's first priest.
3 November 1869: Construction
A permanent church opens beside the railway station, designed by E. W. Pugin and built by J. W. C. Butcher of Harwich for about £730. Countess Helen Tasker helps pay for it, and only the nave and aisles are built at first.
1915: Renovation
During the First World War the Pugin church is extended and its interior turned round, with a new entrance made in the east wall. The work runs until 1918.
1923: Commemoration
A Calvary war memorial is set up at the Pugin church. It will later be carried to the new church at Fronks Road.
1920s: Transfer
Fr Bernard Clay, the parish priest, acquires a site on Fronks Road, Dovercourt, where a new church will eventually rise.
February 1953: Disaster
The great North Sea flood drowns the Pugin church to a depth of about twelve feet. Most furnishings, the parish registers and the records are lost, and the building is never recovered.
8 June 1955: Founding
The new church opens on Fronks Road with Bishop Beck as main celebrant, dedicated to Our Lady Queen of Heaven, a newly instituted feast. Designed by R. A. Boxall and built by Fisher & Woods of Dovercourt for about £15,000 with a presbytery, it receives the old church's organ, windows and Calvary memorial.
1959: Transfer
The abandoned Pugin church is sold for £2,800 and redeveloped as a petrol filling station, ending the parish's first permanent home.
1977: Renovation
The interior is reordered, with the communion rails and pulpit removed.
1986: Construction
A parish centre with a meeting room, kitchen and store opens beside the church.