Orwell Bridge

The Orwell Bridge carries the A14 (formerly the A45) bypass over the River Orwell just south of Ipswich, Suffolk. Designed by Sir William Halcrow & Partners with architectural advice from Frederick Gibberd Partners, it has a 190 metre main span, then the longest prestressed concrete span in use in Britain. Built by Stevin Construction BV from 1979 and opened in 1982, it is a vital link for traffic to and from the Port of Felixstowe, and its closures in high winds and after collisions regularly paralyse Ipswich.

Timeline

October 1979: Construction

Dutch contractor Stevin Construction BV starts work on the bypass bridge across the Orwell estuary, to a design by Halcrow's engineers. A workforce of about 300, almost all recruited locally, begins with the foundations in the river. The height has been agreed with the Port of Ipswich Authority so that shipping can pass beneath.

1 April 1982: Construction

After 38 months of work the bridge structure is complete. Its 190 metre prestressed concrete main span is the longest of its kind then in use in Britain. The approach roads, landscaped on the advice of Frederick Gibberd's practice, are still to be finished.

17 December 1982: Founding

Transport Secretary David Howell formally opens the bridge. It takes the Ipswich southern bypass over the river and relieves the town centre of through traffic heading for Felixstowe docks.

11 February 2011 to 14 February 2011: Renovation

Over a February weekend the north deck is closed for 52 hours while the bridge's bearings are replaced. Traffic is diverted through Ipswich.

28 October 2013: Other

The St Jude storm forces the bridge to shut for more than five hours because of high winds. It is one of a run of wind closures that follow, each sending the A14 traffic through the town's streets.

November 2015: Other

A permanent 60 mph speed limit is brought in across the bridge as part of efforts to make it safer.

3 January 2018: Other

Storm Eleanor closes the bridge for 17 hours, the longest of the wind closures in a stormy winter. Fionn and Georgina close it again later in January.

2021: Other

Variable speed limits are installed, letting the limit drop to 40 mph in high winds so the bridge can stay open where it would once have been shut.