Old London Bridge
Old London Bridge was the medieval stone bridge across the Thames, begun in 1176 under Peter of Colechurch and finished in 1209. For over 600 years it was London's Thames crossing, carrying a street of houses and shops and a chapel, and displaying the heads of executed traitors on spikes. It was replaced by John Rennie's bridge, built 30 metres upstream and opened in 1831. A few stones and an archway survive at St Magnus the Martyr church.
Timeline
1014: Battle
Viking tradition tells that an English and Norse force under Æthelred II and Olaf pulls down the timber bridge held by the Danes. They are said to tie cables to the piers and drag it down, winning the battle for London. Some archaeologists doubt that it happened, and the story is sometimes linked with the nursery rhyme London Bridge is falling down.
1176: Construction
Work begins on a stone bridge to replace the timber ones, supervised by Peter of Colechurch, a priest. It will take more than thirty years.
1209: Construction
The stone bridge is finished in the reign of King John, after the death of Peter of Colechurch. It will carry traffic over the Thames for more than 600 years.
c. 1212: Disaster
A fire starts in Southwark and burns along Borough High Street and through the church of St Mary Overie before it reaches the bridge. Sparks cross the river and set the northern end alight, so that crowds who have come to help or watch are trapped between two fires. Some drown jumping into the Thames, and the rescue boats are overwhelmed. The chronicler John Stow claimed more than 3,000 died, a figure historians think is too high.
1305: Other
The head of William Wallace is displayed on the bridge, the first recorded head set up there. For the next three centuries and more the heads of traitors are exhibited here on spikes, among them Jack Cade in 1450.
1535: Other
The head of Sir Thomas More is set up on the bridge after his execution, in the same year as that of Bishop John Fisher. Thomas Cromwell's head follows in 1540.
1577 to 1579: Construction
Nonsuch House, a grand timber building, is put up in place of the drawbridge tower. It is one of the great sights of the bridge, which by now carries a street of houses and shops.
September 1666: Disaster
The Great Fire of London spares most of the bridge. A fire in 1633 had destroyed its northern houses and left a gap that was only partly refilled, and the gap now works as a firebreak. The houses that do burn are rebuilt in the 1680s and the roadway is widened.
1757 to 1761: Renovation
After an Act of Parliament of 1756, the houses are pulled down, and the last tenant leaves after some 550 years of life on the bridge. A Great Arch replaces two of the centre arches, and a balustrade is added in the Gothic taste.
1831: Construction
John Rennie's new stone bridge opens 30 metres upstream, and the medieval bridge is demolished. King William IV attends a banquet to mark the opening. The archway that has been the pedestrian entrance to the old bridge since 1763 survives in the tower of St Magnus the Martyr.