Norwich Cathedral
At its height Norwich Cathedral is the church of a Benedictine priory of the Holy and Undivided Trinity, the largest building in East Anglia, with a 315 foot spire and more than a thousand carved roof bosses. Herbert de Losinga, first Bishop of Norwich, begins it in 1096 after moving his see from Thetford, and it is consecrated in 1101. Riot and fire in 1272, storms in 1362 and 1463, the end of the monks in 1538 and a Puritan attack in 1643 all leave their marks, yet the Norman core survives. It is the burial place of Edith Cavell, and the founder's throne still stands behind the high altar. Formally the Cathedral Church of the Holy and Undivided Trinity, it is also called the Cathedral of the Holy and Undivided Trinity.
Timeline
9 April 1094: Transfer
Herbert de Losinga moves his bishop's seat from Thetford to Norwich, and the diocese is consecrated here the same day by the Archbishop of York. He has bought the see from William Rufus for a price his critics call simony, and the new cathedral is, in part, his penance. The move follows Lanfranc's rule that bishops should sit in the chief town of their diocese.
1096: Construction
Herbert is said to lay the first foundation stone with his own hands on the Cowholme, a pasture ringed by water, and the church is dedicated to the Holy Trinity. Houses and two Saxon churches are swept away, and a canal is cut so barges can bring Caen stone up the Wensum to face the flint and mortar. Benedictine monks, drawn from Canterbury, settle beside the works, and the building rises from the east end westwards.
24 September 1101: Founding
The new church is consecrated, and the priory begins its round of prayer beside the bishop's throne. The cathedral and its community of monks now form one body, a pattern shared with Durham, Ely and Winchester. The monks will run the church for more than four centuries.
22 July 1119: Death
Herbert de Losinga dies and is buried before the high altar, close to the bishop's throne he set behind it. Most of the cathedral and many monastic buildings stand by now, and he has also founded priories at Yarmouth and Lynn and built a palace beside the church. A service is still held every July in his memory.
1145: Construction
The great Norman church is complete. Bishop Eborard finishes the long nave, and Bishop William de Turbe adds the crossing tower, the most ambitious surviving Norman tower in England. Eborard resigns in this year, leaving the largest building in East Anglia.
c. 1170: Disaster
Fire breaks out among the monastic buildings and spreads to the church, probably destroying the Lady Chapel. The Norman stonework survives and repairs follow. It is the first of the fires that test the cathedral again and again.
11 August 1272: Other
Citizens break into the monastery and set the church on fire, ending a feud over the prior's tolls at the Trinity Fair and grazing rights. After a citizen is killed at the June fair and the killer is cleared by the church court, Prior William de Brunham hires about a hundred men from Great Yarmouth to strike first. Three days of violence and pillage follow, monks and servants are killed, and the Ethelbert Gate is destroyed. Henry III sits in judgement, citizens are hanged, the city is fined heavily and the prior is removed.
December 1278: Renovation
On Advent Sunday the rebuilt cathedral is consecrated again, with Edward I and Queen Eleanor of Castile in attendance. Bishop Middleton is enthroned the same day. The royal presence closes the quarrel with the city, and the refectory, dormitory and guest quarters that burned in 1272 are rebuilt (none survive today).
1297: Construction
Work starts on the cloisters, begun under Bishop Ralph de Walpole, and it will drag on for 133 years, slowed by the Black Death of 1349. The finished cloister is two storeys high, the only one of its kind in England, and its vaults carry nearly 400 carved bosses of Christ's life and the Apocalypse. A wooden spire covered in lead is completed over the crossing in the same year.
1362: Disaster
A hurricane blows the wooden spire down onto the east end, wrecking the presbytery roof and clerestory. The clerestory is rebuilt with larger windows, and a new wooden spire is raised in its place. The taller windows are why the east end looks unlike the Norman nave.
c. 1380: Other
The Despenser Reredos, a painted altarpiece of Christ's Passion, is made for the cathedral, a gift linked to Bishop Henry le Despenser, who crushed the Peasants' Revolt in Norfolk in 1381. It is the only medieval English altarpiece of its kind to survive. Its survival is credited to its being turned over and used as a table top, hidden until 1847.
c. 1420: Construction
Sir Thomas Erpingham, the veteran who commanded the English archers at Agincourt in 1415, builds the gate that faces the cathedral's west door. Its arch is crowded with figures of saints, and it stands as his thanksgiving offering to the church.
1463: Disaster
Lightning strikes the wooden spire, which burns and crashes through the wooden nave roof. The fire burns so hot that it turns some of the cream Norman stone pink, and the damage is still visible. Bishop Walter Lyhart answers by vaulting the nave in stone, a roof of carved and painted bosses from Creation to Judgement.
1480: Construction
Bishop James Goldwell raises a new spire in stone, 315 feet high, the second tallest in England after Salisbury. Being of stone and brick, it cannot burn as its two timber predecessors did. Goldwell also vaults the presbytery in stone, and his rebus, a gold well, appears among the bosses.
1509: Disaster
Another fire destroys the sacristy and the transept roofs. Bishop Richard Nykke has the transepts roofed again with stone vaults, so that stone now covers the whole church. Fire has tested the building a fourth time and again fails to destroy it.
2 May 1538: Transfer
Henry VIII dissolves the priory after 442 years, and his foundation charter makes the last prior, William Castleton, the first dean. Most of the monks stay on as canons of a new chapter of a dean, six prebendaries and sixteen canons. The monastery is gone, and the cathedral now belongs to the secular church alone. The monks' hostry, refectory and dormitory soon fall to ruin and are later pulled down.
1578: Other
Elizabeth I worships in the cathedral during her progress through East Anglia. A throne is set in the presbytery opposite the tomb of her ancestor Sir William Boleyn, and steps are cut into the stonework so she can reach it. The painted coat of arms made for the visit still hangs in the cloister.
1643: Destruction
Puritan soldiers and townsmen break into the cathedral and smash what they see as popish, as Bishop Joseph Hall records in his Hard Measure. Glass, monuments and the organ are destroyed, and the pipes, vestments, service books and statues are burned in a bonfire in the market place. A musket ball from the attack is still lodged in the stonework. By the next year the building is abandoned, and it stands in ruin for some two decades.
1660: Renovation
With the Restoration the cathedral is repaired and worship resumes. Dean John Crofts provides a new organ to replace the one destroyed in 1643. The church is without most of its medieval glass and furnishings, but the stone vaults and their bosses have come through the Reformation and the Civil War.
15 May 1919: Death
Edith Cavell, the Norfolk nurse shot by a German firing squad in Brussels on 12 October 1915 for sheltering Allied soldiers, is laid to rest at Life's Green beside the cathedral. Her body has come home after a memorial service at Westminster Abbey. On the eve of her execution she said that patriotism is not enough and that she must have no hatred or bitterness towards anyone. Her family asked that the grave look like those of the soldiers she cared for, and it is now a place of pilgrimage with a service each October.
June 1942: Disaster
German bombers drop incendiaries across the Close during the Baedeker raids on Norwich. Fires break out in the transept roofs, but fire watchers and the stone vaulting beneath the roof keep them from spreading. The cathedral that survived the medieval fires comes through the Blitz.
4 May 2010: Construction
Queen Elizabeth II and the Duke of Edinburgh open the Hostry, a new visitor and education building by Hopkins Architects, built after a £10 million campaign and now the main entrance. It stands where the monks' guest house once was and follows the new refectory of 2004. The cloister precinct is again a working part of the cathedral.
July 2019: Other
A 17 metre helter-skelter is installed in the nave so visitors can see the roof bosses close up. The former Queen's chaplain Gavin Ashenden calls it poisoning the medicine, and in August the Bishop of Lynn preaches from halfway down the slide. The slide comes down, and the bosses and the Norman stonework remain for visitors to see.