North Bridge, Colchester
North Bridge carries North Station Road over the River Colne on the northern edge of Colchester's historic centre, on a crossing that is probably Roman in origin. The medieval bridge was of timber and was repeatedly repaired and rebuilt. The present Grade II listed cast iron bridge dates from 1843 and was widened in 1903 to take trams.
Timeline
1189: Construction
The timber bridge over the Colne is recorded here for the first time. It carries the road north out of the walled town, and it will need patching and rebuilding for centuries to come.
1580: Renovation
The Borough pays for extensive repairs to the old timber bridge. Its upkeep is a civic burden that keeps returning.
1631: Renovation
The Borough again has to repair what its records call the ruinous North Bridge. The timber crossing is by now decayed enough to threaten the road north.
1781: Construction
The bridge is rebuilt, taking over a northern abutment of three brick arches thought to have been built a few years earlier. It is the last crossing here before the iron age.
May 1843: Construction
Work begins on a new cast iron bridge, completed while R R Nunn is mayor. The Colchester diarist William Wire watches the digging through June, noting a burial in the foundations of the north abutment and a massive piece of Roman masonry on the line of the old crossing.
22 October 1903: Renovation
The bridge is widened by 17 feet 6 inches on its east side, marked by a plaque naming Mayor Henry H Elves. The extra width makes room for Colchester's new tram system.