Menai Suspension Bridge

Thomas Telford set out to carry the London to Holyhead road across the Menai Strait on a bridge high enough for sailing ships to pass beneath, and in 1826 he succeeded with what was then the longest suspension span in the world, 579 feet between its limestone towers. Local ferry owners and tradesmen opposed it, but sixteen wrought-iron chains cut the journey from London to Holyhead by nine hours. The bridge has been strengthened again and again, from a new steel deck in 1893 to steel chains in 1938 to 1940, and has twice been shut in recent years over corroded hangers and weight limits. It is also known as the Menai Bridge, Pont Grog y Borth and the Telford Bridge, and it links Bangor on the mainland with the town of Menai Bridge (Porthaethwy) on Anglesey. It carries traffic still, a Grade I listed landmark.

Timeline

1810: Other

Thomas Telford is asked to report on the road from London to Holyhead, the route that links Parliament to Ireland since the Act of Union. For the Menai Strait he puts forward two ideas, a bridge on piers or a single great arch. Objections to both push him towards a suspension bridge.

14 August 1818: Other

Local gentry and businessmen gather at Caernarfon to oppose Telford's plan, which has just been formally submitted. Ferry owners and port tradesmen stand to lose their living once the Strait can be crossed on foot and wheel. The protest fails to stop the scheme.

1819: Construction

An Act of Parliament authorises the bridge and work begins on the towers, built hollow with internal cross-walls from Penmon limestone. Tunnels are cut into the rock on both shores to anchor the chains. William Hazledine, whose forge is near Shrewsbury, is later contracted to supply the wrought iron.

20 April 1825: Construction

The first chain is lifted into place. A central section is floated out on a raft and hauled up by 150 men on pulleys while a fife and drum band plays. The other fifteen chains follow over the next ten weeks.

30 January 1826: Founding

The bridge opens to traffic amid great fanfare, with 100 feet of clearance for tall ships beneath its deck. The journey from London to Holyhead drops from 36 hours to 27. Anglesey, which had depended on ferries and the tide, is joined to the mainland.

1839: Disaster

Severe winds damage the road surface, which has no stiffening trusses and sways badly in gales. The following year W. A. Provis strengthens the deck to cure the instability.

1893: Renovation

Sir Benjamin Baker, later of the Forth Bridge, replaces the rotting timber deck with steel. The new deck is heavier and leaves the chains carrying far more than Telford intended. Traffic is held to a 4.5 ton limit, and heavy loads must cross in several trips.

c. 1918: Other

The day after an Armistice party, airship captain Tommy Elmhirst flies his airship under the bridge at about 40 mph. The deck passes only a couple of feet above the envelope.

1938 to 1940: Renovation

Under Sir Alexander Gibb and the builders Dorman Long, the old iron chains are replaced with steel while traffic keeps crossing. The carriageway is widened and the weight limit lifted. The work finishes on 31 December 1940, and the crossing toll is dropped.

1940s: Other

In the Second World War, RAF pilot Ken Rees flies a Wellington bomber under the bridge to win a bet. Rees later takes part in the Great Escape from Stalag Luft III, and after the war runs a club at Rhosneigr on Anglesey.

1999: Renovation

The bridge shuts for about a month to resurface the road and strengthen the deck. All traffic is sent over the Britannia Bridge a mile away.

11 December 2005: Renovation

Both carriageways reopen after the first major repainting in 65 years, which began in February with one carriageway closed for six months. The paint is stripped to bare metal. The bridge appears the same year on the reverse of the British one pound coin.

21 October 2022: Other

The bridge is shut without warning after corrosion is found in the hangers that hold up the deck, a problem that had already brought a 7.5 tonne limit in June. Anglesey loses its main road link, leaving the Britannia Bridge to take the traffic. Temporary supports go in around the faulty hangers.

1 February 2023: Other

The bridge reopens to traffic in both directions after four months, with the 7.5 tonne limit kept in force. Hanger replacement is planned for later in the year.

4 October 2025: Other

The bridge closes to all traffic again after a recommended 3 tonne limit proves impossible to police. It partially reopens to cars, cyclists and pedestrians on 10 October, and reopens fully on 24 October.