Main Court, St Catharine's College
The principal court of St Catharine's College, Cambridge, a three-sided court open to Trumpington Street, built from the 1670s to replace the college's decayed medieval buildings. It is attributed to the master-builder Robert Grumbold and is one of only a few such three-sided courts at Oxford and Cambridge. The fourth side has never been built, though proposals to close it have been made many times.
Timeline
25 November 1473: Founding
Robert Woodlark, Provost of King's College, founds Katharine Hall on St Catharine's Day after preparing the ground since 1459. The little society occupies modest buildings on this site, and Edward IV grants its royal charter two years later.
1626: Transfer
Dr John Gostlin, Master of Gonville and Caius, leaves the Bull Inn to the hall. Its income pays for scholarships and helps complete the chapel, and part of the property is soon enclosed as a new court beside the old one.
1673: Construction
With the old buildings decayed, the college begins pulling them down to raise a new court. Money comes from subscriptions, loans and annuities, and even some college plate is sold, though it fetches little.
1675: Construction
The new hall is built in the first year of John Eachard's mastership. Eachard drives the whole rebuilding forward with bold borrowing, and the college credits him with achieving it. The design is attributed to Robert Grumbold, who had worked as master-builder under Christopher Wren in Cambridge.
1676: Construction
The walls and roof of the new chapel are complete, but the money runs out before the interior can be fitted. It stays unfinished for nearly thirty years.
1704: Commemoration
The chapel is finally fitted out and consecrated, closing the long rebuilding of the court. William Talman, Controller of the King's Works, had been consulted on its design.
1757: Construction
James Essex adds the A and B staircases, paid for by the will of Mrs Ramsden, made in 1743. Her forecourt turns the college to face Trumpington Street, but her plan for a grand street front is rejected for lack of money, leaving the court open on its fourth side as it remains.
October 2022: Other
A temporary hall nicknamed the Catzebo is raised on the lawn of Main Court and opens in October. It serves the college while the Central Spaces project, costing about 16 million pounds, renovates the Trumpington Street site.