Lowestoft Bridge
Lowestoft Bridge, also called the Harbour Bridge or the Bascule Bridge, carries the A47 over the harbour channel linking Lake Lothing to the sea, joining central Lowestoft to Kirkley. The channel was cut from 1827 as part of the Norwich and Lowestoft Navigation, and a fixed bridge opened in 1830. Samuel Morton Peto's improvements brought a swing bridge in 1846, replaced by a wider one in 1897. That was demolished in 1970, and the present second-hand bascule bridge opened in 1972. It has long been a bottleneck for road traffic and shipping.
Timeline
9 June 1830: Construction
The first Harbour Bridge opens to traffic across the new cut between the sea and Lake Lothing, part of the navigation to Norwich. It is a fixed bridge with narrow gaps between its piers, so it is judged inadequate almost at once. Larger vessels cannot pass through to the lake.
1846: Construction
With the railway reaching Lowestoft, Samuel Morton Peto, who had bought the failing harbour company, replaces the fixed bridge with an iron swing bridge. It opens the channel to bigger ships and reconnects the two halves of the town. Kirkley and Pakefield then grow rapidly with new terraces and waterside industries.
1897: Construction
The worn-out first swing bridge is replaced by a second one, 116 feet long, built across a widened channel. It turns through 90 degrees to rest along the quay wall. Townspeople already feel another crossing is needed further west, but two world wars and austerity mean none is built, so this bridge serves for 73 years.
April 1970: Destruction
The old swing bridge is demolished, leaving the town without a direct crossing. For two years a ferry carries people across the channel, and the only road alternative is the long detour via the Mutford crossing at Oulton Broad.
18 December 1971: Construction
Over the weekend of 18 and 19 December the second-hand bascule bridge is lowered into position across the widened channel. It is meant to last about 30 years and carries a three-lane road.
24 March 1972: Founding
The bascule bridge is officially opened, four days after it first took traffic on 20 March. The ferry era ends, but the bridge does little to ease congestion in a town of some 45,000 people. Critics say it was obsolete from the day it opened.
2008: Renovation
Long past its intended 30-year life, the bridge gets its first major overhaul, costing millions of pounds. Afterwards it often fails to open or close, and closes for around a month a year on average between 2008 and 2012. Each failure snarls the town and holds up shipping in the port.