Huntingdon Methodist Church

The Methodist church on the High Street in Huntingdon, Cambridgeshire. Its Wesleyan congregation took the site in 1811, worshipped in a first chapel there for about sixty years, and replaced it with the present building of 1878, attributed to the local builder Robert Hutchinson. Once part of the St Neots circuit, it joined the Hunts Mission Circuit in 1903, and since 2012 has been extended and refurbished as a community centre under the Here4Huntingdon scheme.

Timeline

1811: Construction

The Wesleyan Methodists of Huntingdon acquire a plot in the High Street and put up their first purpose-built chapel on it. Until now the town's Methodists have met in borrowed rooms, and the new chapel gives them a permanent home. It will serve them for some sixty years.

22 May 1878: Construction

With the old chapel demolished, the congregation lays the foundation stones of a larger church on the same High Street site. The first building has become too small for the growing congregation and the needs of the town. The new church is built by Robert Hutchinson.

18 October 1878: Founding

The new Methodist chapel opens for worship, just under five months after its foundation stones were laid. It is the building the congregation still uses, and it becomes the centre of Methodist life in the town.

1903: Other

The church leaves the St Neots circuit, of which Huntingdon's Methodists had been part since the 1790s, and becomes a member of the newly formed Hunts Mission Circuit. The congregation now answers to a circuit centred nearer home.

1978: Commemoration

The congregation marks a hundred years in the High Street church with a centenary celebration. The occasion looks back over the chapel's long history in the town.

1988: Renovation

The church interior is reworked, and the neighbouring Wesleyan manse, no longer needed, is pulled down around the same time. Bathroom and kitchen facilities follow in 2000.

2016: Renovation

The first two phases of the Here4Huntingdon scheme, begun in 2012, are finished. The roof is replaced and insulated, the front facade is rebuilt and its stonework restored, and the rear hall is redeveloped from top to bottom, so the church can serve the wider community.

December 2021: Construction

A new western extension with an entrance and reception area opens, completing the third phase of the redevelopment. The pandemic, a discovery of asbestos and a collapsed drain delayed it and added £65,000 to the cost. The whole project has cost over £985,000, with the congregation raising around £203,000 of it.