A Grade II listed steel and brick bridge at Honing in north Norfolk, carrying Dilham Road over the cutting of the old Midland and Great Northern Joint Railway. Four brick arches rest on girders, carried by slender lattice pillars with delicate arched braces, and the plate parapet is decorated with bolted-on trefoils. The railway is gone, and the track below is now the Weavers' Way footpath.
Timeline
13 June 1881: Construction
The bridge is built to carry Dilham Road over the new railway line through Honing, which opens to traffic on 13 June 1881. Its brick arches and lattice pillars are made in steel, with trefoils bolted along the parapet as decoration.
1882: Founding
Honing station opens beside the line a short way west of the bridge, with a single platform. Trains now pass under the road bridge on the route towards Great Yarmouth, giving the village its link to the wider network.
1893: Other
The Midland and Great Northern takes over the line, and drawings for a 'reconstruction' of the bridge carry the company's name. It is not certain how much was rebuilt, but the bridge passes into the care of a company that will run the line until closure.
1900s: Renovation
Between 1899 and 1901 the line at Honing is improved with a half-mile crossing loop and a signal box at each end. The bridge now spans a line built up for more traffic.
1959: Other