High Level Bridge, River Tyne
A railway runs on top and a road hangs underneath: the High Level Bridge carries trains 112 feet above the Tyne and a narrow road and footways on the deck below, between Newcastle and Gateshead. Robert Stephenson and Thomas Elliot Harrison designed it as a wrought and cast iron tied arch, and it opened in 1849 to close the gap in the line from London to Edinburgh. It has also been called the Newcastle High Level Bridge. It later took trams, survived a failed wartime bombing raid aimed at it, and was rescued by a major restoration that won a Europa Nostra prize. Grade I listed, it still carries East Coast trains.
Timeline
1836: Other
The builder Richard Grainger and the engineer Thomas Sopwith propose a railway crossing of the Tyne, set only 20 feet above high water. Nothing comes of it, and the gorge stays unbridged for railways while the north and south lines wait for a solution.
1841: Other
The Newcastle architect Benjamin Green proposes a high level road bridge across the gorge. His idea is the seed of the crossing that will be built on almost the same line a few years later.
31 July 1845: Founding
Parliament authorises the Newcastle and Berwick Railway, and its Act demands a combined road and rail bridge over the Tyne, finished within four years. George Hudson, the Railway King, needs it to join his line from York and Darlington to the route north to Berwick. Robert Stephenson is his engineer, and Thomas Elliot Harrison is instructed that autumn to draw up the design.
January 1847: Construction
Masonry is laid for the piers, built by John Rush and Benjamin Lawton of York with stone from Heddon on the Wall. The river is shallow, with about 30 feet of silt over bedrock, so the foundations are driven down by one of James Nasmyth's new steam pile drivers, here used in bridge building for the first time. Some 650 Newcastle and 130 Gateshead families lose their homes to make room for the bridge and its approaches.
29 August 1848: Construction
A special train crosses the first iron arch and a temporary timber viaduct built beside the piers. The arch had been lifted into place in July, and the cast iron ribs come from Hawks, Crawshay and Sons of Gateshead. Four ladies ride on the test train, among the first passengers over the gorge.
7 June 1849: Construction
George Hawks, Mayor of Gateshead and head of the ironworks that cast the arches, drives in the last key of the structure. The ironwork has taken about 5,050 tons of metal and £112,000.
11 August 1849: Other
Captain Laffan of the Board of Trade tests the bridge with four tender locomotives and 18 wagons, about 200 tons. He pronounces it "perfectly secure and safe", and one track is cleared for traffic.
15 August 1849: Founding
The first passenger train crosses the bridge, without ceremony. The gap in the railway between London and Edinburgh is closed, and the line that will become the East Coast Main Line runs through.
28 September 1849: Commemoration
Queen Victoria inaugurates the bridge on her journey through Tyneside, a month after the first trains have passed. Thomas Elliot Harrison drives the royal train. The Gateshead fiddler James Hill soon writes "The High Level Hornpipe" to celebrate the opening, a tune still used to test young fiddlers.
4 February 1850: Other
The road deck comes into ordinary use, six months after the trains. A halfpenny toll is charged to cross on foot, and the income is less than the company hoped.
October 1854: Disaster
The Great Fire of Newcastle and Gateshead rages below, and the bridge becomes a vantage point for the watchers. It is said to vibrate like a thin wire while the town burns below.
24 June 1866: Disaster
A fire at a corn mill on the Newcastle shore spreads to the timber decking of the bridge. Rail traffic is stopped from about half past eight in the morning until two in the afternoon, and the damage comes to between £2,000 and £3,000.
June 1871: Other
The road opens day and night to traffic. Around 1880 a horse omnibus crosses for a halfpenny fare, and the tolls stay in force until 1937.
1890: Renovation
Locomotives have grown far heavier than the 20 ton engines of 1849, so the cast iron cross girders are strengthened with steel box girders. The bridge is kept in service for heavier trains.
1 October 1906: Construction
The King Edward VII Bridge opens about 500 yards upstream and relieves the High Level of through traffic. Trains had to reverse in Newcastle station, and the new bridge gives a shorter route in. The older bridge remains in use as a turning loop.
1922: Renovation
Trams cross the bridge, after an agreement of 1920 to link the Newcastle and Gateshead systems. Steel beams replace cast iron longitudinal members to carry them.
10 May 1937: Other
The road tolls end after 87 years, with the LNER paid £160,000 in compensation. Newcastle City Council takes over the road surface and sets a 9 ton limit.
2 July 1940: Disaster
The Luftwaffe makes its first major raid on Newcastle and Gateshead, and the High Level Bridge is its target. The attack fails to hit the bridge, but 13 people are killed and 123 injured in the streets around.
1955: Renovation
The timber rail deck is replaced by steel, a job that runs to 1959. Ballasted track adds some 150 tons to every span.
February 2005: Renovation
The road is closed for a restoration of about £42 million. Cracks in the iron girders are found, and the footpath shuts in 2006. The road deck is replaced, the corroded hangers are renewed, and 57,000 square metres of iron are inspected and tested.
2 June 2008: Renovation
The road reopens, one way from Newcastle to Gateshead, and limited to buses, taxis and light goods vehicles. About 50,000 illegal crossings by other drivers follow in the first three months.
May 2009: Commemoration
The restoration wins the Grand Prize for Conservation from Europa Nostra, whose jury praises its engineering professionalism. Network Rail later fixes plaques to the bridge.
25 July 2024: Renovation
The bridge reopens to walkers and road users after a year of work costing £5.2 million. Beams are repainted and the road deck waterproofed, under scaffolding hung without touching the Grade I ironwork. Trains run on the upper deck throughout, as they have since 1849.