Hemsby railway station

Hemsby railway station was a single-platform station on the line between Great Yarmouth and Melton Constable in Norfolk, beside the level crossing on The Street. It opened in 1878 as the terminus of the Great Yarmouth and Stalham Light Railway, passed to the Midland and Great Northern Joint Railway in 1893, then to the LNER and British Railways, and closed in 1959. Its goods siding and cattle pen served local farms, and in the 1930s it fed the holiday halts along the coast. Nothing of the station building survives, but the stationmaster's house on North Road and a Station Villa recall it.

Timeline

16 May 1878: Founding

The Great Yarmouth and Stalham line opens as far as Hemsby, and the village station receives its first trains. For a while Hemsby is the end of the line, with a single platform just south of the level crossing on The Street.

1893: Transfer

The line, by now pushed on to Stalham and Melton Constable, is taken over by the Midland and Great Northern Joint Railway. Hemsby becomes a small station on a cross-country route that carries holidaymakers from the Midlands to the Norfolk coast.

June 1933: Other

A summer 'halts' service starts between Yarmouth Beach and Potter Heigham, calling at Hemsby and at new halts such as Scratby and California. Seaside visitors now ride short hops along the coast, and Hemsby sits in the middle of the holiday traffic.

1936: Transfer

The joint company's independent existence ends and the London and North Eastern Railway takes over running the line. Hemsby's trains carry on much as before under new management.

1 January 1948: Transfer

Britain's railways are nationalised and the station passes to the Eastern Region of British Railways. By 1954 nine trains a day run to Yarmouth, with extras on Wednesdays and Saturdays and none on Sundays.

2 March 1959: Other

The whole Midland and Great Northern line from Yarmouth Beach to Melton Constable shuts, and Hemsby station closes with it. Falling traffic and coast erosion at California Point and Caister are among the reasons given. The building is later cleared, and the track bed beyond is reused for the A149.