Haven Bridge

The bascule bridge carrying the road over the River Yare between Hall Quay and Southtown, opened by the Prince of Wales in 1930. A bridge has stood here since at least 1427; a granite bridge of 1854 preceded the present one. The lifting span still opens for river traffic. It suffered a mechanical failure in 2019 and was rebuilt at a cost of 2 million pounds by December 2023.

Timeline

c. 1427: Construction

A bridge across the Yare at the haven is first recorded, linking the walled town to the Suffolk side of the river.

1553: Construction

A wooden drawbridge was built across the River Yare at Great Yarmouth in 1553, the first documented bridge on this site after a horse, cattle and foot ferry had linked the town to Southtown since at least 1261. It carried the only fixed crossing between the borough and its southern suburb until it was destroyed by a storm tide seventeen years later.

1570: Destruction

A high spring tide destroyed the 1553 drawbridge in 1570, cutting Great Yarmouth's only fixed link to Southtown. The corporation had it rebuilt on the same site within the year, at a cost of £403 15s 9d.

1786: Construction

The rebuilt drawbridge was replaced in 1786 by a new wooden drawbridge, built at a cost of just over £2,000. It served the growing port for almost sixty years before the volume of river traffic made a larger crossing necessary.

21 October 1854: Construction

Following the Yarmouth Bridge Act passed by Parliament in 1849, a new stone bridge with a central iron lifting span was built after the contractors overcame a collapsed cofferdam and quicksand in the riverbed. It opened to the public on 21 October 1854, having used around 2,600 tons of stone and 300 tons of iron at a total cost of about £60,000.

21 October 1930: Construction

The present Haven Bridge, a double bascule bridge built by the engineering firm Sir William Arrol & Co (whose other work includes Tower Bridge and the Forth Bridge), replaced the 1854 stone bridge after contracts were awarded in 1926. Its 650-ton cast-iron leaves are counterbalanced with Aberdeen granite ballast and rest on steel caissons sunk into the riverbed; the bridge cost around £300,000 and was opened by the Prince of Wales on 21 October 1930, exactly 76 years after its predecessor, with crowds lining the quays and rooftops to watch.

3 July 1937: Disaster

A spring only two inches long failed in the bridge's lifting mechanism on 3 July 1937, leaving the leaves stuck pointing skyward for just over an hour, between 9.25am and 10.35am, while staff worked frantically to find and mend the fault. It caused what the local press called the greatest traffic hold-up in Great Yarmouth's history, and the passenger ferry across the Yare recorded the busiest period in its records as a result.

22 August 1969: Disaster

The Belgian trawler Styn Streuvels struck Haven Bridge on 22 August 1969 and sank in the harbour. It was one of several collisions between shipping and the bridge over the decades: a Scottish drifter was trapped against it by a powerful flood tide in 1961, and the coaster Ellen M rammed it and was held there by the tide for four hours in 1962.

c. 2019: Disaster

Haven Bridge suffered a catastrophic structural failure in 2019, forcing its closure and beginning a prolonged period of intermittent operation, restricted hours and disputes over funding responsibility between Norfolk County Council and the bridge's operator, Peel Ports, that continued into the mid-2020s.

December 2023: Renovation

Reconstruction after a catastrophic mechanical failure in 2019 was completed, restoring the lifting span at a cost of about 2 million pounds.

1 July 2024: Other

After Peel Ports shut the bridge entirely on 9 April 2024 citing a health and safety concern, an 83-day blockade of the River Yare ended when the bridge reopened to river traffic on 1 July 2024, under a temporary six-month funding agreement between Norfolk County Council and Peel Ports. This followed a £1.2 million repair project completed the previous December that had already restricted the bridge to fixed daily opening times and introduced a £20 transit fee for vessels.