Harecastle Tunnel
James Brindley set out to drive a canal through a hill that fought him with floods and changing rock, and he died before the water ran through. The result, on the Trent and Mersey Canal between Kidsgrove and Tunstall, was the longest canal tunnel in Britain when it opened in 1777, with no towpath, so boatmen lay on their backs and pushed the boat along with their feet. Thomas Telford built a second, wider bore beside it in 1824 to 1827, and the two worked side by side, one for each direction, until Brindley's bore partly collapsed from mining subsidence in 1914. Telford's tunnel is still used by narrowboats today. The tunnel is also called the Harecastle Canal Tunnel, the Legging Tunnel, and the Grand Trunk Canal tunnel, and the two bores are known as Brindley's and Telford's.
Timeline
1770: Construction
James Brindley sets his line over Harecastle Hill and sinks fifteen vertical shafts along it, so that gangs of navvies can mine outward from the bottom of each. The rock shifts from soft earth to Millstone Grit, and water floods the workings again and again. Steam engines are brought in to drive the pumps, and stoves at the foot of the upcast pipes keep the air moving.
1770s: Other
With no towpath, the boats are legged through. Men lie on their backs on the cargo and push against the roof and walls with their feet, taking about three hours a passage and paid by the boat. Meanwhile the boat horses are led over Harecastle Hill by Boathorse Road, often by boat children, and a lodge cottage by the squire's drive keeps watch on them.
1777: Construction
The tunnel is finished, five years after Brindley's death in 1772. At 2,880 yards it is more than twice the length of any other canal tunnel in the world, and it carries the Trent and Mersey Canal under the hill. It is only about 9 feet wide and has no towpath.
1820: Other
Brindley's branch to an underground wharf at a Goldenhill colliery, in which he had held an interest, is found unsafe and closed. The coal trade it served shows how much the hill's mines and the canal depended on one another. Within a few years the same hill is the scene of a second tunnel.
13 April 1824: Construction
The first clod of Thomas Telford's new tunnel is cut on the Potteries side. The legging bottleneck in Brindley's bore has grown too costly, and the canal company's rejected scheme for a towpath in the old tunnel has left a second bore as the only answer. Telford leaves the daily work to his resident engineer, James Potter.
24 November 1826: Construction
James Caldwell, chairman of the canal company, lays the last brick of Telford's tunnel. The bore runs 2,926 yards, close to dead straight, and has taken roughly nine million bricks. Telford, after two years' use, says he cannot find one crack or decayed brick in it.
30 April 1827: Founding
Telford's tunnel opens to boats, with a towpath on arches that lets horses haul them through in about ninety minutes, and ends legging in the new bore. Traffic now splits, northbound through the new tunnel and southbound through Brindley's, and side tunnels let coal from the Goldenhill mines be loaded straight into boats.
1914: Disaster
Mining subsidence brings part of Brindley's tunnel down, and it is closed for good. The bore that once beat every tunnel in the world is left to the dark, and Telford's tunnel must carry all the traffic alone. Both portals remain, one gated and one a brick archway.
1914: Invention
An electric tug, bought for £1,563, replaces the horses in Telford's tunnel. It hauls itself along a cable laid on the canal bed, powered from batteries in accumulator barges charged at a plant at the south end. It takes a train of boats through in about forty minutes for sixpence a boat.
1931: Other
A second tug joins the first, and power now comes from an overhead conductor, so the accumulator barges are no longer needed. The tunnel stays busy with working boats through the years between the wars.
1951: Other
For the Festival of Britain, disused coal workings off the hill's old mines are opened to visitors, who pay a shilling to go in. It is a brief turn from industrial passage to attraction for the underground world Brindley's shafts first cut into.
1954: Renovation
Diesel narrowboats make the electric tug unnecessary, and it is withdrawn after forty years. Three large fans are installed at the south portal behind an airtight door, drawing fumes out so that diesel boats do not suffocate their crews. The fan house still hides Telford's entrance.
September 1973: Disaster
Subsidence closes Telford's tunnel to boats, cutting the canal in two. Settlement has lowered the roof and sunk the towpath in places. Repairs begin, with the towpath taken out to give boats more room in the centre.
2 April 1977: Other
Sir Frank Price, chairman of the British Waterways Board, reopens Telford's tunnel after four years. Without its towpath it is wider for boats, though still one way at a time. Boats now go through in convoys, alternating north and south, in thirty to forty minutes.
2014: Death
A boater is knocked overboard in the tunnel's lowest section and dies. Subsidence has left the roof low there, and helmsmen are warned by a white arc to watch the change in profile. The tunnel's low headroom remains a hazard of the passage.
12 December 2014: Commemoration
A Transport Trust plaque is unveiled at the south portal, recording the two parallel tunnels opened in 1777 and 1827. All four portals are Grade II listed, though the bores themselves are not protected. A visitor today sees Telford's gated entrance and, nearby, Brindley's disused brick archway.