Hammersmith Bridge
Hammersmith Bridge is a green and gold Victorian suspension bridge between Hammersmith and Barnes, the lowest-slung and most bombed bridge in London, and one that has spent much of recent years shut to traffic. It replaced William Tierney Clark's bridge of 1827, the first suspension bridge across the Thames, and Joseph Bazalgette built his ornate successor on the same river piers in 1887. It has outlasted a crowd that made the first bridge sway, a rescue and a brave bomb-throwing in the twentieth century, three IRA attacks, and cracks in its iron that have kept cars off it since 2019. It is a Grade II* listed structure, and the Boat Race passes beneath it each year.
Timeline
9 June 1824: Founding
Parliament passes the act that lets a company of local people build a bridge at Hammersmith. Until now anyone heading for the Surrey bank has faced a long detour by Kew or Fulham, and the owners of those toll bridges have fought the scheme. The Hammersmith Bridge Company raises £80,000 and takes on William Tierney Clark, the engineer of the local waterworks, to design it.
6 October 1827: Construction
Tierney Clark's bridge opens as the first suspension bridge over the Thames, its iron chains slung between two Tuscan stone towers standing in the river. It is a toll bridge, with an octagonal toll-house at each end and liveried keepers, and it pays its investors well. Under the tower arches the roadway narrows to 14 feet, so carts and pedestrians must share it.
1870: Other
Between 11,000 and 12,000 people pack onto the bridge to watch the University Boat Race pass beneath, and the deck sways alarmingly as spectators rush from side to side. The Evening Standard condemns the "shameful overcrowding", and the painter Walter Greaves records the packed deck. Doubts about Clark's design have grown since the 1850s, and the crowd shows what the old bridge cannot bear.
26 June 1880: Transfer
The Metropolitan Board of Works, which has bought the bridge under the Toll Bridges Act of 1877, abolishes the tolls, and Hammersmith, Putney and Wandsworth bridges all become free to cross on the same day. The sale is a rare profitable one for the owners. Free crossing brings more traffic, and the narrow roadway between the towers becomes a bottleneck.
1884: Construction
After a boat collides with the old bridge in 1882 and an Act of 1883 allows its replacement, a temporary bridge is thrown across the river to carry traffic. Sir Joseph Bazalgette, the Board's chief engineer, then dismantles the old superstructure but keeps the piers. The temporary bridge is later reused as a footbridge at Teddington.
June 1887: Construction
Bazalgette's new bridge opens in June, with steel chains, wrought-iron towers in ornamental cast iron, and a carriageway widened to 21 feet beneath the arches. It is built by Dixon, Appleby and Thorne for about £82,000, and the towers carry the royal arms and the crests of London, Kent, Guildford, Westminster and Colchester. The royal opening is variously credited to Prince Albert Victor and to the Prince of Wales. It is the bridge that still stands.
27 December 1919: Other
Near midnight, Lieutenant Charles Campbell Wood, a South African serving in the RAF, hears a cry for help, runs to the upstream side and dives into the Thames to save a woman who has fallen in. She lives, but he injures his head in the dive and dies of tetanus about two weeks later. A small brass plaque on the upstream handrail marks the spot.
29 March 1939: Other
In the small hours, during the IRA's S-Plan bombing campaign, Maurice Childs, a Chiswick hairdresser walking home, finds a smoking suitcase on the bridge and hurls it into the river, where it explodes. A second bomb goes off on the bridge, breaking windows nearby and damaging the balustrade and suspension rods. Two men are arrested that morning and get sentences of 20 and 10 years, and Childs receives 50 guineas from the London County Council and an MBE.
26 April 1996: Other
The Provisional IRA plants two Semtex bombs on the south bank side of the bridge, among the largest quantities of Semtex found in Britain at the time. The detonators go off but the explosive fails to ignite, and the bridge is spared. Repairs and restoration of the bridge's green and gold paintwork follow in the years after.
1 June 2000: Other
At about 4.30 in the morning a Real IRA bomb explodes beneath the Barnes span, shaking nearby houses and damaging the ironwork. It is the third attack on the bridge. The bridge is closed for repairs, and it reopens after about two years with a weight limit.
10 April 2019: Other
Cracks found in the cast-iron pedestals that carry the chains close the bridge indefinitely to motor vehicles. Corroded rollers have stopped the bearings from moving freely as the temperature changes. Buses, cars and lorries disappear from a bridge that has carried traffic since 1827, and a long argument over who should pay for repairs begins.
13 August 2020: Other
After a heatwave worsens the structural trouble, the bridge closes to everyone, pedestrians and cyclists included. A government task force is set up the following month. Pedestrians and cyclists are allowed back from 17 July 2021, and the chains are later wrapped in foil and cooled in hot weather.
April 2025: Renovation
A resurfaced roadway, with a lightweight plywood deck costing £2.9 million, reopens to pedestrians and cyclists. Cars remain barred, and the cost of fully restoring the bridge for traffic runs to hundreds of millions of pounds. Visitors can walk across the green and gold bridge again.