Halton Cross
In the churchyard of St Wilfrid's at Halton-on-Lune stands a cross that is part Anglian, part Viking and part Victorian, and its base carries one of the clearest pictures of the Norse hero Sigurd outside Scandinavia. The lower shaft, carved in the tenth or early eleventh century, shows Sigurd killing the dragon Fafnir and his foster-father Regin, set beside Christian emblems. It was cut down to a sundial pedestal in 1635 and rebuilt from fragments in 1891, when older Anglian pieces were added. Also called the Sigurd Cross, it is a scheduled monument.
Timeline
800s: Construction
Anglian sculptors carve crosses for the church at Halton in the eighth or ninth century. Pieces of these, among them a haloed head and shoulders under an arch, the emblems of the four Evangelists and plaitwork for a cross arm, will one day be built into the cross in the churchyard. Ten pre-Conquest fragments survive here, a sign of how important this church was in early Northumbria.
900s: Construction
A new cross goes up on a three-stepped base, a form that is a Viking-age novelty in England. Its shaft tells the story of Sigurd: the smith Regin forges a sword, Sigurd roasts Fafnir's heart and sucks his burnt thumb while two birds warn him, and Regin lies beheaded. Christian symbols share the stone, and scholars debate whether the carvers meant a pagan message or simply a good story. The date is tenth century by one view and early eleventh by another.
1635: Transfer
In the reign of Charles I the rector, Richard Jackson, has the cross knocked down to a stump of a little over four feet, about six feet of shaft being removed. A sundial plate is set on the stump, inscribed 'For Saint Wilfrite Church at Halton 1635' with the motto 'Pereunt et imputantur', the hours pass and are counted against us. The cross is lost, but the Sigurd carvings survive because the stump is kept as a pedestal.
1887: Discovery
A four-sided carved piece bearing the emblems of the Evangelists is found loose in the church porch. Matthew, Mark, Luke and John are shown, John part bird and Luke part bull. It is one of the fragments that will soon crown the shaft, though it may originally have come from Caton.
1891: Renovation
The antiquary W. S. Calverley rebuilds the cross on the south side of the churchyard from the Sigurd shaft, four older fragments and new stone. The sundial plate moves to a new pedestal near the porch. The four fragments, believed to belong to the original cross, include the Evangelist piece and an arm of the cross-head. The result stands about 4.5 metres high, and it is a scheduled monument today.