Hainault tube station
Hainault tube station is a London Underground station on the Hainault loop of the Central line in the London Borough of Redbridge. It began as a Great Eastern Railway station on the Fairlop Loop between Woodford and Ilford, closed for lack of passengers, and reopened under the LNER before the Central line's delayed Eastern Extension brought it into the Tube network in 1948. Its depot also served the line, and the Woodford to Hainault section later became a testing ground for automatic train operation.
Timeline
1 May 1903: Founding
The Great Eastern Railway opens Hainault station on its new Fairlop Loop branch, which runs between Woodford and Ilford through open Essex countryside. The line is built to tempt suburban development, but there is little around the station yet to supply passengers.
1 October 1908: Other
Passenger numbers prove too low to justify the service, and the station closes. It stays shut for more than two decades while the surrounding fields remain largely empty.
2 March 1930: Other
The London and North Eastern Railway, which inherited the Great Eastern's lines in 1923, reopens the station to passengers as growth spreads outward from London.
1938: Construction
Work begins to transfer the LNER loop to the Central line as part of the New Works Programme, with a large depot planned at Hainault. War stops the work the following year, though the depot building is finished.
1939 to 1945: Occupation
With the Tube works suspended, the finished depot building stands unused by London Transport. The United States Army Transportation Corps takes it over and uses it until 1945.
29 November 1947: Other
Steam services to Hainault end to make way for electrification. Two weeks later, on 14 December, the line from Newbury Park is electrified and the new depot starts receiving Central line trains.
31 May 1948: Founding
Electrified Central line trains start running from Hainault to central London via Gants Hill, after years of delay. The station becomes a terminus, with a new island platform on the west side, and gives the new London County Council estate a direct Tube link.
21 November 1948: Other
Services to Woodford via Grange Hill return, closing the loop. Hainault stops being a terminus and becomes a through station.
1960s: Other
From the mid 1960s the Woodford to Hainault section runs largely apart from the rest of the Central line, with 1960 Stock trains. It becomes the testing ground for the automatic train operation later used on the Victoria line, and the arrangement lasts until the early 1990s, when 1992 Stock takes over.
19 August 2016: Other
The Central line begins its 24-hour Night Tube service on Friday and Saturday nights, bringing all-night trains to Hainault.