Gymnasium at Smithdon School
A glass-walled gymnasium on the edge of Hunstanton, designed by the young architects Alison and Peter Smithson as part of their first competition win. Its central seven bays are glazed from top to bottom, set between solid buff brick ends. It stands beside the Smithsons' school, long known locally as the glasshouse and often called the first New Brutalist building, which opened as Hunstanton Secondary Modern School and became Smithdon High School. It is listed Grade II*.
Timeline
1950: Other
Alison Smithson, aged 21, and her husband Peter, aged 26, win the competition to design a new secondary school at Hunstanton. It is their first competition win and launches them towards fame. Their scheme will include a separate gymnasium beside the main block.
1950s: Renovation
Soon after completion the glass walls begin to break, and the building overheats in the sun. The fixes are wooden sub-frames for the glazing and black panels in place of some clear glass. The change leaves the glasshouse a little less transparent than the Smithsons drew it.
c. 1951 to 1954: Construction
The gymnasium goes up as a freestanding block of one tall storey, with a steel frame and buff sandlime brick infill. Solid brick fills the two ends, while the seven central bays of the long side are glazed from top to bottom. Steel is rationed and unusual in school building at the time, and the exposed frame is meant to show the materials as they are.
September 1954: Founding
The school opens in the autumn of 1954 with 439 pupils and 18 staff, and the gymnasium comes into use beside it. The all-glass building is controversial from the start, and locals nickname it the glasshouse.
1980: Other
Hunstanton Secondary Modern School becomes a comprehensive and is renamed Smithdon High School. The name comes from the old Smithdon Hundred, not from the Smithsons, though many assume so. The gymnasium now serves pupils of every ability, no longer only those who failed the 11-plus.
2025: Renovation
The London practice Jestico + Whiles wins the competition to refurbish the school, now Grade II* listed after some 70 years of continuous use. The gymnasium stands as a standalone building among the low pavilions around the main block. Planning consent follows, with the pupils to move out temporarily while the repairs are carried out.