Gunpowder Railway
At its height the Gunpowder Railway is a web of about three and a half miles of narrow track, much of it on raised wooden platforms, hauling explosives between the mills of the Royal Gunpowder Factory at Waltham Abbey without a spark. Begun in the 1850s with wooden rails and hand-pushed wagons, it grows through the cordite years and two world wars to link the North and South Sites, then withers once manufacture ends. Volunteers rebuild a kilometre of it from 2003 as a 2 foot 6 inch gauge heritage line inside the Royal Gunpowder Mills site, also known as the Waltham Abbey Royal Gunpowder Mills railway.
Timeline
9 January 1856: Other
A plan drawn on 9 January lays out the first railway at the mills. It serves a new steam-powered mill, the first at a factory whose mills have all been driven by water, with a raised line along the mill's north side and two turntables at the eastern end beside two magazines.
February 1859: Founding
The railway opens in February, about 600 feet long. It joins the charcoal mill and the gunpowder mixing house to the new steam incorporating mill, and its rails are wood so that no spark can reach the powder.
1888: Construction
The system grows to serve the A, C, D, E and F incorporating mills and runs on to the new canal cut, now Powdermill Cut, ending at the Group F mill and its magazine. Most of it now runs on raised wooden platforms level with the mill floors, on a gauge of 2 foot 3 inches, and the wagons are still pushed by hand.
1889: Other
The factory turns from gunpowder to cordite, and the railway begins carrying nitroglycerin and guncotton as well as charcoal, saltpetre and sulphur. The same wagons now move a far more dangerous cargo.
1897: Renovation
The lines are extended and converted to a narrower 18 inch gauge. In the process areas the rails are wholly of wood, and the wagons are still hand-pushed.
1916: Construction
With the First World War straining output, a heavier line is laid to carry locomotives. About 3.5 miles (5.6 km) long, it crosses Highbridge Street to join the north and south mills and uses three swing bridges over the waterways. Interchange sidings with the Great Northern Railway beside the Royal Small Arms Factory connect the works to the national network.
1917: Arrival
Four Ruston Proctor paraffin locomotives arrive, each hauling nine loaded two-tonne wagons at up to 6 mph. Battery-electric locomotives take most of the traffic from now on, since steam engines are ruled out by the risk of explosion.
1943: Other
Manufacture ceases at Waltham Abbey and moves to the Royal Ordnance Factory at Bishopton in Scotland, because a gunpowder factory is judged too close to London. Having carried the ingredients of gunpowder, cordite, TNT and RDX, the railway loses its purpose.
1952: Destruction
The link between the North and South Sites is taken up. Some track and a few battery locomotives stay in use until 1954, and the railway ends entirely in the 1960s.
July 2003: Arrival
A first locomotive, No. 4 Chris H, arrives in July. Volunteers begin to rebuild a railway on the site where the old one has long gone, this time to a gauge of 2 foot 6 inches.
October 2022: Founding
The rebuilt line, about a kilometre long with two stations, ends its first full public season in late October, having carried over 1,500 passengers. They ride in converted wagons from the naval armaments depot at Trecwn.
September 2025: Other
Nearly 2,000 passengers ride in the 2025 season, taking the total carried since reopening past 7,500. The line runs on Saturdays and alternate Sundays from April to September.