Great Whyte

The unusually long, wide main street of Ramsey, Cambridgeshire, built over the Bury Brook. The name is thought to come from the Saxon 'waite', a dock, and in medieval records it appears as the Whyte, Wythte or le Withe. Until the 1850s an open river ran down its centre, with docks at each end serving the town and its abbey. Today the brook runs in brick culverts beneath the road.

Timeline

1841: Construction

The first attempt to tame the open river begins. A stretch from High Bridge to Descows steps is arched over, with local brickmaker Thomas Darlow offering 25,000 bricks towards the work. Most of the Whyte is still an open, foul watercourse.

April 1852: Construction

Contractors Booth and Lunn start the main culvert, covering the Bury Brook along the Great Whyte. The brook has served as the town's sewer, and outbreaks of typhoid and cholera are blamed on it. Over two million bricks go into a tunnel about 2,240 feet long, replacing an open river crossed by six bridges, including the medieval stone High Bridge.

November 1852: Disaster

Flood water bursts the new, unfinished culvert. A second burst follows in the summer of 1853. The brook is not yet willing to be buried.

December 1853: Construction

Messrs Coker and Oakes of Swaffham win the contract for the side culverts, at about £2,095. These let sewage and drains run into the outer tunnels, keeping clean water in the main one, for a town that otherwise draws its water from street pumps. The whole system is finished by December 1854.

1888: Construction

The Memorial Clock rises on the Great Whyte in memory of Edward Fellowes, 1st Baron de Ramsey. Made by Macfarlane and Company of Glasgow, it stands over the chamber where the main tunnel splits in three, and is first driven by the water running beneath it.

1912: Disaster

'Black Monday' brings the worst flood the town has known. The Bury Brook overwhelms its tunnels, and water pours through the Rose and Crown Yard, the docks and into St Mary's Road.

1920: Renovation

The clock on the Great Whyte is converted to electricity, ending its long reliance on the water of the buried brook.

1979: Disaster

Flooding returns almost seventy years after Black Monday. Water climbs close to the top of the car park wall behind the old Rose and Crown yard, and rises at Lion Yard too.