Great Stink
In 1856 the engineer Joseph Bazalgette drew up a plan to carry London's sewage far out to the east, and for two years nobody would pay for it. Then the hot summer of 1858 turned the Thames into an open sewer beside the new Houses of Parliament, and the government, driven out of its own rooms by the smell, passed the necessary law in a matter of weeks. The result was about 1,100 miles of street sewers, 82 miles of main sewers, the pumping stations at Crossness and Abbey Mills, and the Thames embankments. The crisis is known as the Great Stink, and the sewers it produced still serve London.
Timeline
September 1854: Disaster
Cholera tears through Soho, part of an outbreak that kills 10,738 Londoners in 1853 and 1854. The physician John Snow, who has argued since 1849 that the disease travels in water, not foul air, has the Broad Street pump handle removed and the deaths fall away. A leaking sewer is later found near the well. Most of the authorities still blame miasma, and the river stays as it is.
July 1855: Other
The scientist Michael Faraday takes a boat on the Thames, drops scraps of white paper into it and watches them vanish in the murk. He writes to The Times that the whole river was for the time a real sewer, and warns that neglect will not go unpunished. Nothing is done.
June 1856: Other
Joseph Bazalgette, chief engineer of the new Metropolitan Board of Works, submits his scheme: interceptor sewers running east with the flow, with pumping stations to lift the low-level sewage, and outfalls well down the river. The First Commissioner of Works, Sir Benjamin Hall, objects to outfalls within London and sends the plan to outside referees. Their report in 1857 would move the outfalls fifteen miles further out as open sewers, at £5.4 million against Bazalgette's £2.4 million, and the scheme stalls.
16 June 1858: Disaster
London reaches 35 degrees Celsius in a dry heatwave, and the low river leaves raw sewage stewing on the foreshore. The press christens it the Great Stink. At Parliament the river-side curtains are soaked in chloride of lime, the Lords' library becomes a stench trap, MPs flee with handkerchiefs to their faces, and the MP John Brady urges moving business out of London. Lime is poured into the river by the hundred tons.
15 July 1858: Other
Benjamin Disraeli, Chancellor of the Exchequer, brings the Metropolis Local Management Amendment Bill before the Commons and calls the Thames a Stygian pool, reeking with ineffable and intolerable horrors. The bill makes the Metropolitan Board of Works responsible for the river, allows it to borrow £3 million, and favours Bazalgette's plan. In The Times's words, Parliament legislates by the force of sheer stench.
2 August 1858: Other
The bill becomes law, within about eighteen days of its introduction and just before the session ends. After a decade of cholera and years of warnings, the Board of Works can at last build the sewers.
31 January 1859: Construction
Work begins on the northern system, which serves two thirds of London's people. A labourers' strike in 1859 and 1860, frosts and heavy rain slow it. The low-level sewage will be lifted 36 feet at Abbey Mills, Stratford, a pumping station with a Byzantine-looking dome by Bazalgette and Charles Driver, which Pevsner calls exciting architecture applied to the most foul purposes.
June 1862: Disaster
The wall of the Fleet sewer collapses beside the Metropolitan Railway cutting at Clerkenwell. Victoria Street floods and the gas and water mains are damaged. It is one of the setbacks of the building of the northern sewers.
April 1865: Construction
The Prince of Wales opens Crossness pumping station on the Erith Marshes, with a dinner for 500 attended by the Archbishops of Canterbury and York. Four beam engines by James Watt and Co., named Victoria, Prince Consort, Albert Edward and Alexandra, lift the southern sewage into a reservoir for release on the ebb tide.
1866: Disaster
Cholera kills 5,596 Londoners, 93 per cent of them in the East End between Aldgate and Bow, which the new sewers do not yet serve. Dr William Farr traces it to the East London Water Company, whose intake lies downstream of its outfall. It is the last cholera outbreak London suffers.
July 1870: Construction
The Prince of Wales opens the Victoria Embankment from Westminster to Blackfriars, in place of the ill Queen. It reclaims riverside land, carries a sewer, and turns the reeking foreshore into a road and promenade.
3 September 1878: Disaster
The pleasure steamer Princess Alice sinks after colliding with the collier Bywell Castle, and more than 650 people die. The river here is fouled by the outfall sewage, and the effect of the sewage on the victims is much discussed.