Godmanchester Chinese Bridge

A timber footbridge in the Chinese Chippendale style over a mill stream of the River Great Ouse, beside the Town Hall on The Causeway in Godmanchester. Known locally as the Chinese Bridge or the town bridge, to tell it from the older Chinese bridge at Island Hall, it is Grade II* listed and one of the best loved images of the town. Designed by the young Irish architect James Gallier in 1827, it is now in its fourth generation, each a replica of the last.

Timeline

1827: Construction

James Gallier, a 29 year old Irish architect, designs and builds a Chinese Chippendale footbridge across the mill stream, with gault brick abutments and a lattice of timber between. The fashion for Chinese taste had peaked in the previous century, and the older Chinese bridge at nearby Island Hall had already set the example. Gallier is in the district as clerk of works on Huntingdon's new prison, and the bridge is one of his earliest commissions.

1860s: Renovation

Age has caught up with Gallier's timber, and the bridge is rebuilt in the 1860s. It is the second bridge on the spot, and it keeps the original's lattice design, so the view across the water does not change.

1960: Renovation

The decayed Victorian bridge is taken down and replaced with a facsimile, built by the Godmanchester firm of G. B. Brudenall Ltd for the council at a cost of £1,580. The town gets a third Chinese Bridge that looks just like its predecessors.

9 February 2010: Destruction

At daybreak a crane and its crew strap up the bridge, which has become dangerously heavy because it has soaked up so much water. The last leg beside the Town Hall refuses to be cut free and wrecks four saws before the bridge finally lifts away in the afternoon. At about five tons it is too big for the lorry, so it is cut in half and driven off, to the dismay of some townspeople.

15 February 2010: Construction

A new replica, made by CTS Bridges of Shepley near Huddersfield, arrives in two halves on lorries. A pontoon crane ferries each half across the river, and the two meet over the water. The rails take weeks to fit, through snow and floods, in time for the town's Gala Day in the summer. The planned opening party in April never happens.