Electrical Engineering Division Building
The Electrical Engineering Division Building stands at 9 JJ Thomson Avenue on the University of Cambridge's West Cambridge campus. Completed in 2006, it houses the Electrical Engineering Division of the Department of Engineering and was built to hold the Centre for Advanced Photonics and Electronics (CAPE), a partnership between the university and international technology companies. It was extended in 2015 with an annexe that became home to the Cambridge Graphene Centre. It is also known as the CAPE building.
Timeline
2004: Founding
The Centre for Advanced Photonics and Electronics begins its first phase, a partnership between the university and a small group of international photonics and electronics companies. Its aim is to turn science into technology through shared, multidisciplinary research, and its first six years are backed by £7.5 million from industry. The new centre needs a purpose-built home on the West Cambridge site.
2005: Construction
Building rises on West Cambridge to house the electrical engineering researchers and the new centre. Industrial investors including Advance Nanotech, ALPS Electric, Dow Corning and Ericsson Marconi back the project, and the plan includes laboratories and a cleanroom. Occupation is hoped for by January 2006, but the work runs a little late.
April 2006: Founding
The building is officially opened, bringing the university's Electrical Engineering Division and CAPE together under one roof of over 4,800 square metres. It serves a division of about 20 academics, 70 postdoctoral researchers and 170 research students. The division has already produced ten spin-out companies in the previous five years, and the building is meant to speed that route from laboratory to industry.
2011: Other
CAPE enters a second phase, running to 2024 with £15.4 million of partner funding. Over its life the centre draws in ten companies from the USA, Europe, Japan, China and the UK, and partners carry projects such as holographic head-up displays and Smectic-A liquid-crystal technology into mass production.
April 2014 to June 2015: Construction
An annexe is built onto the building over fourteen months, adding offices and laboratories. Some areas, including clean rooms on the ground and second floors, are left unfinished and completed later as separate smaller projects.
July 2015: Arrival
Over the summer the Cambridge Graphene Centre and the Hetero-Genesys Laboratories move into the new annexe. Graphene research, one of the university's fast-growing fields, now sits beside the electronics and photonics groups already working in the building.