Eau Brink Cut

The Eau Brink Cut is a straight artificial channel of about two and a half miles that carries the Great Ouse into King's Lynn, bypassing a bend of roughly seven miles. It takes its name from Eau Brink, a mansion and farm on the opposite bank. Authorised by an Act of 1795 and designed by the engineer John Rennie, it opened on 31 July 1821 to ease navigation and drain the Middle and South Levels. Long argued over by Lynn's merchants and the fen landowners, it silted quickly, was widened under Thomas Telford, and was blamed by some for flooding and for harming local fisheries.

Timeline

1795: Other

Parliament passes the Eau Brink Act, a compromise between the merchants of King's Lynn and the fen landowners. Engineers for both sides are to agree a joint plan for a straight cut across the great seven-mile bend of the Ouse. Then years of war, the fear of invasion and the difficulty of raising money leave the scheme on paper.

1818: Construction

With peace restored after Waterloo and public loans available, digging finally begins on the cut to John Rennie's design. Thomas Telford advises as checking engineer for the river's navigation interests. The work, much of it by hand with spade and barrow, takes nearly four years.

31 July 1821: Founding

The cut opens, and the steam packet Swiftsure, come from Gravesend, passes through to its upper end. John Rennie, who planned the works, lives to see it, but dies in October of the same year. The Ouse now runs straight into Lynn instead of winding round the old bend.

April 1822: Renovation

Only months after opening, a bank of sand and mud has already formed in the channel. Thomas Telford and the younger John Rennie report that it is too narrow and recommend widening it. The widening follows in the next few years.

1834: Other

John Owen petitions the Bedford Level Corporation over his rent, blaming the cut for destroying his smelt fishery. His complaint is one of many against a project accused of silting the river below and of worsening flooding in the South Level.

1853: Construction

The Norfolk Estuary Company extends the cut northwards, building its banks out into the Wash to reclaim land and carry the river's flow further to sea.