Down Street tube station

Beneath a shop front in Mayfair lies a station where the Prime Minister once dined on caviar and champagne while the Blitz raged overhead. Down Street opened in 1907 on the Piccadilly line, also known as Down Street (Mayfair), but it was never busy and closed in 1932. In 1939 its empty tunnels became the secret bomb-proof headquarters of the Railway Executive Committee, which ran Britain's mainline railways through the war, and Winston Churchill and the War Cabinet used it as a refuge. Afterwards it survived as an engineering access and emergency exit, and the London Transport Museum now opens it to visitors on Hidden London tours.

Timeline

15 March 1907: Founding

Down Street opens on the Great Northern, Piccadilly and Brompton Railway, three months after David Lloyd George opened the rest of the line in December 1906. Its ox-blood red tiled building, with semi-circular upper windows, is the house style of the company's architect Leslie Green. The platforms lie 22 metres below Piccadilly, reached by a pair of Otis lifts, and the site was slow to complete because land was hard to buy and the Board of Trade had to approve the safety of the underground layout.

c. 1909: Other

Trains begin to rush through Down Street without stopping. The neighbourhood is wealthy and largely residential, many residents prefer private transport, and Dover Street and Hyde Park Corner stations lie within a few hundred metres either side. The deep platforms make the station a poor bargain for the few who do want it.

5 May 1918: Other

The Sunday service is withdrawn, a sign of how little the station is used. By 1929 a report counts about 1.24 million passengers a year and takings of just over £5,000, and Down Street is named among the stations that could close.

21 May 1932: Other

The last train calls and Down Street closes for good. Dover Street and Hyde Park Corner have been rebuilt with escalators and entrances nearer to Down Street, and the Piccadilly line extension to Cockfosters wants faster journeys. The lifts are removed and a fan is fitted at the foot of one shaft.

30 May 1933: Construction

A siding of 836 feet comes into use between Down Street and Hyde Park Corner. Part of the old platforms is cut away to make room for a step-plate junction, where tunnels of different diameter join, so the closed station's tunnels now serve the running railway.

April 1939: Renovation

With war looming, the Railway Executive Committee needs a headquarters safe from air raids to run Britain's mainline railways, and the disused station, 22 metres down in the centre of London, fits. The London Passenger Transport Board does the engineering and the London, Midland and Scottish Railway fits out the rooms, power and communications. The platforms are bricked up and the tunnels divided into offices, meeting rooms, dormitories, dining rooms and bathrooms, with a telephone exchange linking the railway companies and government.

3 September 1939: Occupation

On the day war is declared, a staff of 75 descends the 103-step spiral staircase to take up the Railway Executive Committee's work. There is no lift yet, and the rooms still lack doors and ceilings. The headquarters is entered from a street door at 24 Down Street guarded by two police officers.

c. 1940: Other

In the autumn of 1940, during a Blitz raid, Churchill and several Cabinet members arrive at Down Street at about seven in the evening. The War Cabinet meets in the railway conference room an hour or two later. A senior minister had visited and arranged the stay, and the Committee's secretary G. Cole-Deacon calls the place an underground hive of industry.

November 1940: Other

Churchill dines in the executive mess room with members of the Railway Executive Committee and the War Cabinet. Despite rationing, the railway hotels that supply the kitchen serve cigars, caviar, vintage champagne and brandy. His private secretary John Colville calls the place the safest he knows, and Churchill is said to call it The Barn.

March 1941: Occupation

Churchill and his wife Clementine begin to use Down Street as alternative sleeping quarters. A second suite built in an air shaft for him is finished within six weeks of the request, but the heavy bombing ends and it is never used for its intended purpose. The Committee adopts his marginal notes on railway plans without knowing they are his.

November 1943: Other

Churchill's access to Down Street is withdrawn. If bombing resumes, he is to use the shelter code-named Anson, part of the Rotunda, instead.

1946: Other

The control room arranges more than 2,500 special trains in a single seven days, showing the scale of what the Committee still directs a year after the war. It stays in Down Street until 1947, when the railways pass towards nationalisation, and the station goes back to London Transport.

27 April 2015: Other

Transport for London invites business proposals to transform the disused station, with about half of it released for development. Its commercial director Graeme Craig calls the combination of space, history and location a unique opportunity, while the staircase and adjoining parts stay in use for running the railway.

2016: Other

The London Transport Museum opens the bunker to the public on guided Hidden London tours. Visitors walk the wide wartime tunnels, where partitions and direction signs from the Railway Executive Committee's years still survive, and a wartime lift shaft stands empty.