Doncaster Works
At its height Doncaster Works, always called "the Plant", was the principal engineering works of the Great Northern Railway and then the LNER's Eastern Section, turning out the Stirling Singles, the Ivatt Atlantics and Gresley's Pacifics, among them Flying Scotsman and Mallard, whose 126 mph run in 1938 is still the steam speed record. It also built pioneering carriages, made Horsa gliders in the Second World War and produced the last steam and diesel locomotives of British Rail's era. After steam ended in 1963 it built diesels and electrics, passed into private hands, and was cut back until only a carriage refurbishment site operated by Wabtec remained. It is also known as Doncaster Railway Works and the Plant Works.
Timeline
1853: Founding
The Great Northern Railway opens its new works at Doncaster, replacing its earlier workshops at Boston and Peterborough. The first phase, finished by 1855, covers five acres of workshops on an eleven acre site, with an erecting shop holding thirty locomotive berths. For its first years the works only repairs and maintains engines.
1866: Other
Patrick Stirling becomes the Great Northern's Locomotive Superintendent and takes charge of the Plant. He will hold the post until 1895, and his tall-wheeled express engines, the Stirling Singles, will become the works' first famous product.
1867: Other
Doncaster stops being a repair shop alone and begins building new locomotives. It is the change that turns the Plant into a manufacturing works in its own right.
1873: Invention
The works builds its first sleeping cars, starting a line of carriage firsts. Passengers on the long run north can now lie down on the journey.
1879: Invention
Doncaster builds the first dining cars in the United Kingdom. Meals are now served on the move on the Great Northern's trains.
1882: Invention
The first corridor coaches are built at the Plant, letting passengers walk through a train for the first time. By 1891 the works is turning out 99 locomotives, 181 carriages and 1,493 wagons in a year.
1890: Construction
Locomotives are outgrowing the narrow aisles of the old erecting shop, so Doncaster firm H Arnold and Son builds a new one, finished in 1891 at a cost of £13,000. It holds twenty engines at once under two 30 ton cranes. Here the Ivatt Atlantics, Flying Scotsman and Mallard will all be assembled.
1895: Other
Henry Alfred Ivatt is appointed Locomotive Superintendent in succession to Stirling. His powerful Class C1 Atlantics, nicknamed Klondyke, will be built in the new erecting shop, and he will hold the post until 1911.
1911: Other
Nigel Gresley succeeds Ivatt as chief of the Doncaster locomotive department. Over the next thirty years he will design the Pacifics, the A4 streamliners and the V2 freight engines that make the Plant's name. He is knighted in 1936.
24 February 1923: Construction
No. 4472 Flying Scotsman, a Gresley Pacific built at Doncaster, enters service as the first engine delivered to the newly formed LNER. It is one of ten locomotives ordered in July 1922 under Engine Order No. 297.
1 May 1928: Other
The Flying Scotsman train runs non-stop from London to Edinburgh for the first time, 392 miles in 8 hours 3 minutes, behind a Doncaster-built Gresley Pacific. A corridor tender lets the crews change over while the train is moving.
30 November 1934: Other
Flying Scotsman, hauling a light test train between Leeds and London, reaches 100 mph and is officially authenticated as the first steam locomotive to do so. It is the first great speed claim for an engine built at the Plant.
3 March 1938: Construction
No. 4468 Mallard, a streamlined Gresley A4 Pacific, leaves Doncaster Works and enters service. It belongs to a class of thirty-five designed for the Silver Jubilee express and shaped with wind tunnel tests.
3 July 1938: Other
On Stoke Bank south of Grantham, Mallard reaches 126 mph, the world speed record for steam traction. Driver Joe Duddington and fireman Thomas Bray are testing a new Westinghouse brake with a seven-coach train and a dynamometer car. The record still stands.
1940: Disaster
Fire destroys the carriage building shop at the Plant. The loss comes in the first year of the war, when the works is turning to war production.
c. 1942: Other
In the Second World War the Plant, like other railway workshops, joins the war effort and builds wooden Horsa gliders, the type used in the D-Day airborne assault, along with other war items.
1949: Construction
New carriage buildings go up, designed for British Railways' standard all-steel Mark 1 coaches. The works is being set up for a new nationalised era.
1957: Other
BR Standard Class 4 No. 76114 is completed, the last of the 2,228 steam locomotives built at Doncaster. Steam construction has come to an end at the Plant.
1962: Other
Carriage building finishes at Doncaster. The works is modernised with a new diesel locomotive repair shop to keep it going without steam.
November 1963: Other
A4 No. 60009 Union of South Africa is overhauled, the last of an estimated 10,000 steam locomotives to be overhauled at the Plant. The year also sees Flying Scotsman come off its final British Railways working at Doncaster in January.
1976: Other
Under British Rail Engineering Limited the Plant begins building Class 56 heavy freight diesel-electrics, the start of a run of 135. From 1983 to 1987 it builds the Class 58, the last locomotives built by British Rail.
October 1987: Transfer
The British Rail Board sells the wagon works to RFS Industries in a management buyout. In 1998 the company is bought by the Westinghouse Air Brake Company, and in March 2000 it is rebranded Wabtec.
July 2003: Commemoration
The Plant celebrates its 150th anniversary with an open weekend. The works that built Mallard and Flying Scotsman opens its gates to the public.
2007: Destruction
Bombardier Transportation closes its part of the works, ending a century and a half of heavy engineering on much of the site. Early in 2008 the main locomotive repair shop on the Crimpsall is demolished to make way for housing.