Department of Engineering, University of Cambridge
The University of Cambridge's engineering department, based on Trumpington Street. Its first purpose-built home on the site, the Inglis Building, was begun in 1920 with money from Sir Dorabji Tata and is named after Sir Charles Inglis, who led the department from 1919 to 1943. The Baker Building and the James Dyson Building later rose in front of it.
Timeline
1875: Founding
James Stuart becomes the first holder of the new Professorship of Mechanism and Applied Mechanics, a chair that grew out of a bequest left by the Rev. Richard Jackson in 1782. Engineering at Cambridge has its start, with Stuart building a department around him.
1878: Construction
The first engineering workshop goes up on Free School Lane, a wooden hut fifty feet by twenty. It is extended three times by 1900, and by 1920 it is serving more than 800 students, far more than it was ever meant to hold.
1919: Other
Charles Inglis, home from the war with an OBE after designing the army's Inglis Bridge, is chosen to head the department. Over the next quarter of a century he makes it the largest in the university and one of the best regarded engineering schools in the world.
1920: Construction
Work starts on a new building on Trumpington Street, paid for by a large gift from Sir Dorabji Tata. It is the department's first building on the site and finally promises to replace the overcrowded Free School Lane huts.
1932: Transfer
The department leaves Free School Lane completely and settles on Trumpington Street, half a century after the first wooden workshop was put up.
1943: Other
Inglis retires as head of the department after a quarter of a century, with his wartime Inglis Bridge by then largely overtaken by the Bailey bridge. He is knighted in 1945, and after his death in 1952 the original building takes his name.
13 November 1952: Construction
The Duke of Edinburgh opens the Baker Building, built in front of the Inglis Building. Further wings follow, the last in 1965 with a 334-seat lecture theatre, as the department keeps growing.
2016: Construction
The James Dyson Building is finished in front of the Baker Building, adding offices and seminar rooms. A plan to move the whole department out to West Cambridge over the following decade has already been announced.